If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0585083606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.055859,"lon":-115.058818,"icon":""}]} |
Location: 00/06-36-058-08W5/0 | |
Location Alias: 00/06-36-58-08 W5M | |
Location Alias 2: 00/06-36-058-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 5 | |
Range: 08 | |
Section: 36 | |
County/Municipality: Lac Ste. Anne County | |
Well Name: CVE PADDLER 6-36-58-8 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0096132 | |
License Date: 1982-06-03 | |
License Status: RecCertified | |
Spud Date: 1982-06-23 | |
Final Drill Date: 1982-07-05 | |
Well Total Depth: 1585.00 m | |
Surface Hole Latitude: 54.055859 | |
Surface Hole Longitude: -115.058818 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-06-03 | Obtained License |
1982-06-30 | Drill Stem Test Performed |
1982-07-02 | Drill Stem Test Performed |
1982-07-05 | Finished Drilling |
1982-07-05 | Well Mode changed to Drilled and Cased |
1982-07-06 | Drill Stem Test Performed |
1982-07-07 | Production Casing Operation Performed |
1982-09-01 | Perforation Treatment Performed - Jet Perforation |
1982-09-01 | Well Began Production |
1982-09-01 | Well Fluid changed to Crude Oil |
1982-09-01 | Well Mode changed to Pumping |
1982-09-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-09-07 | Perforation Treatment Performed - Jet Perforation |
1982-09-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-09-15 | Perforation Treatment Performed - Fractured |
1982-11-30 | Well Fluid changed to Crude Oil |
1982-11-30 | Well Mode changed to Suspended |
1990-10-25 | Well Log Performed |
1990-10-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-10-26 | Plug Back Performed |
1990-10-26 | Well Abandoned |
1990-10-26 | Well Fluid changed to Crude Oil |
1990-10-26 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-09-01 | Perforation | 1422.00 | 1423.60 | 13 |
1982-09-02 | Acid Treatment | 1422.00 | 1423.60 | 0 |
1982-09-07 | Perforation | 1406.00 | 1409.00 | 13 |
1982-09-07 | Perforation | 1413.50 | 1415.00 | 13 |
1982-09-08 | Acid Treatment | 1406.00 | 1415.00 | 0 |
1982-09-15 | Fracture | 1406.00 | 1423.60 | 0 |
1990-10-26 | Packing Device Capped w/Cement | 1387.00 | 1395.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 417 | 0.0 | 0.0 | 0.0 |
For data sources see[5]