X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585101306000

Well Details

Well ID: 0585101306000
Loading map...
Location: 00/06-13-058-10W5/0
Location Alias: 00/06-13-58-10 W5M
Location Alias 2: 00/06-13-058-10 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 10
Section: 13
County/Municipality: Woodlands County
Well Name: ROSELAND ET AL LEAMAN 6-13-58-10
Operator Name: Zargon Oil & Gas Ltd.
License Number: 0230687
License Date: 1999-12-16
License Status: RecCertified
Spud Date: 2000-01-04
Final Drill Date: 2000-01-11
Well Total Depth: 1566.40 m
Surface Hole Latitude: 54.013908
Surface Hole Longitude: -115.354832

For data sources see[1][2]

Well History

Date Event
1999-12-16 Obtained License
2000-01-07 Surface Casing Operation Performed
2000-01-10 Well Log Performed
2000-01-11 Finished Drilling
2000-01-13 Production Casing Operation Performed
2000-01-13 Rig Released
2000-01-13 Well Mode changed to Drilled and Cased
2000-01-19 Perforation Treatment Performed - Jet Perforation
2000-01-19 Well Log Performed
2000-01-20 Perforation Treatment Performed - Jet Perforation
2000-01-20 Well Log Performed
2000-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-23 Plug Back Performed
2000-01-23 Well Log Performed
2000-07-21 Perforation Treatment Performed - Jet Perforation
2000-07-22 Perforation Treatment Performed - Jet Perforation
2000-07-22 Perforation Treatment Performed - Open-Hole Completion
2000-07-22 Well Log Performed
2000-07-25 Well Log Performed
2000-07-26 Well Log Performed
2000-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-27 Plug Back Performed
2000-07-27 Well Abandoned
2000-07-27 Well Log Performed
2000-07-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-01-19 Perforation 1541.00 1542.00 17
2000-07-21 Perforation 1528.40 1529.90 17
2000-07-21 Perforation 1530.90 1531.90 17
2000-07-21 Perforation 1535.00 1536.00 17
2000-07-21 Perforation 1538.00 1540.00 17
2000-07-21 Perforation 1541.00 1542.00 17
2000-07-22 Open Hole/Barefoot Completion 1554.00 1566.40 0
2000-07-22 Perforation 1560.00 1562.00 13
2000-07-27 Packing Device Capped w/Cement 1537.50 1545.50 0
2000-07-27 Packing Device Capped w/Cement 1507.00 1515.00 0
2000-01-19 Perforation 1538.00 1540.00 17
2000-01-20 Perforation 1535.00 1536.00 17
2000-01-20 Perforation 1530.90 1531.90 17
2000-01-20 Perforation 1528.40 1529.90 17
2000-01-20 Perforation 1525.90 1527.90 17
2000-01-21 Acid Treatment 1525.90 1542.00 0
2000-01-23 Packing Device Capped w/Cement 1511.00 1519.00 0
2000-07-21 Perforation 1525.90 1527.90 17

For data sources see[4]



References