X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585112210000

Well Details

Well ID: 0585112210000
Loading map...
Location: 00/10-22-058-11W5/0
Location Alias: 00/10-22-58-11 W5M
Location Alias 2: 00/10-22-058-11 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 11
Section: 22
County/Municipality: Woodlands County
Well Name: IONIC BLUERIDGE 10-22-58-11
Operator Name: TAQA North Ltd.
License Number: 0010516
License Date: 1955-11-22
License Status: Abandoned
Spud Date: 1955-11-29
Final Drill Date: 1956-01-16
Well Total Depth: 1776.40 m
Surface Hole Latitude: 54.030192
Surface Hole Longitude: -115.546757

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-11-22 Obtained License
1955-12-24 Drill Stem Test Performed
1955-12-29 Drill Stem Test Performed
1956-01-02 Drill Stem Test Performed
1956-01-05 Drill Stem Test Performed
1956-01-10 Drill Stem Test Performed
1956-01-11 Drill Stem Test Performed
1956-01-12 Drill Stem Test Performed
1956-01-14 Drill Stem Test Performed
1956-01-16 Finished Drilling
1956-01-20 Production Casing Operation Performed
1956-01-21 Well Log Performed
1956-01-24 Perforation Treatment Performed - Jet Perforation
1956-02-03 Perforation Treatment Performed - Cement Squeeze
1956-02-07 Perforation Treatment Performed - Jet Perforation
1956-02-09 Perforation Treatment Performed - Acid Wash - No Pressure
1956-02-16 Perforation Treatment Performed - Cement Squeeze
1956-02-20 Perforation Treatment Performed - Jet Perforation
1956-02-22 Perforation Treatment Performed - Acid Wash - No Pressure
1956-02-26 Well Mode changed to Drilled and Cased
2002-10-01 Well Began Production
2002-10-01 Well Fluid changed to Gas
2002-10-01 Well Mode changed to Flowing
2003-07-01 Well Fluid changed to Gas
2003-07-01 Well Mode changed to Suspended
2014-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-03-10 Perforation Treatment Performed - Cement Squeeze
2014-03-10 Plug Back Performed
2014-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-03-12 Perforation Treatment Performed - Jet Perforation
2014-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-03-14 Perforation Treatment Performed - Cement Plug
2014-03-14 Perforation Treatment Performed - Cement Squeeze
2014-03-14 Perforation Treatment Performed - Jet Perforation
2014-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-03-15 Perforation Treatment Performed - Jet Perforation
2014-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-03-16 Perforation Treatment Performed - Cement Plug
2014-03-16 Perforation Treatment Performed - Cement Squeeze
2014-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-03-19 Perforation Treatment Performed - Cement Squeeze
2014-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-03-20 Perforation Treatment Performed - Jet Perforation
2014-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-03-21 Perforation Treatment Performed - Cement Squeeze
2014-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-03-22 Perforation Treatment Performed - Cement Squeeze
2014-03-22 Perforation Treatment Performed - Jet Perforation
2014-03-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-03-24 Perforation Treatment Performed - Cement Squeeze
2014-03-24 Perforation Treatment Performed - Jet Perforation
2014-03-24 Plug Back Performed
2014-03-24 Well Fluid changed to Gas
2014-03-24 Well Mode changed to Abandoned Zone
2014-03-28 Well Abandoned
2014-03-28 Well Fluid changed to Gas
2014-03-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-01-24 Perforation 1682.80 1684.90 13
2014-03-12 Perforation 1395.00 1396.00 17
2014-03-12 Perforation 1307.00 1308.00 17
2014-03-12 Packing Device Capped w/Cement 1396.00 1400.00 0
2014-03-14 Cement Squeeze 1395.00 1396.00 0
2014-03-14 Cement Plug 1309.00 1395.00 0
2014-03-14 Packing Device Capped w/Cement 1243.00 1309.00 0
2014-03-14 Packing Device Capped w/Cement 959.00 967.00 0
2014-03-14 Perforation 900.00 901.00 17
2014-03-15 Packing Device Capped w/Cement 901.00 906.00 0
2014-03-15 Perforation 625.00 626.00 17
1956-02-03 Cement Squeeze 1682.80 1684.90 0
2014-03-16 Cement Squeeze 900.00 901.00 0
2014-03-16 Cement Plug 893.00 900.00 0
2014-03-16 Packing Device Capped w/Cement 883.00 893.00 0
2014-03-17 Packing Device Capped w/Cement 626.00 631.00 0
2014-03-19 Cement Squeeze 625.00 626.00 0
2014-03-19 Packing Device Capped w/Cement 605.00 617.00 0
2014-03-20 Perforation 550.00 551.00 17
2014-03-20 Packing Device Capped w/Cement 551.00 555.00 0
2014-03-21 Cement Squeeze 550.00 551.00 0
2014-03-21 Packing Device Capped w/Cement 528.00 540.00 0
1956-02-07 Perforation 1682.80 1684.90 13
2014-03-22 Perforation 330.00 331.00 17
2014-03-22 Packing Device Capped w/Cement 331.00 335.00 0
2014-03-22 Cement Squeeze 330.00 331.00 0
2014-03-22 Packing Device Capped w/Cement 305.00 321.00 0
2014-03-24 Packing Device Capped w/Cement 190.00 195.00 0
2014-03-24 Perforation 189.00 190.00 17
2014-03-24 Cement Squeeze 189.00 190.00 0
2014-03-24 Packing Device Capped w/Cement 170.00 184.00 0
1956-02-09 Acid Wash 1682.80 1684.90 0
1956-02-16 Cement Squeeze 1682.80 1684.90 0
1956-02-20 Perforation 1682.80 1684.60 13
1956-02-22 Acid Wash 1682.80 1684.60 0
2014-03-10 Cement Squeeze 1682.20 1684.60 0
2014-03-10 Packing Device Capped w/Cement 1640.00 1652.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1970 61 0.0 0.0 0.0
1985 157 0.0 0.0 0.0
2001 668 0.0 0.0 0.0
2002 4 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-02-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References