X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585190203000

Well Details

Well ID: 0585190203000
Loading map...
Location: 00/03-02-058-19W5/0
Location Alias: 00/03-02-58-19 W5M
Location Alias 2: 00/03-02-058-19 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 19
Section: 02
County/Municipality: Yellowhead County
Well Name: ACL PINE CK 3-2-58-19
Operator Name: Paramount Resources Ltd.
License Number: 0028074
License Date: 1965-04-01
License Status: Issued
Spud Date: 1965-04-06
Final Drill Date: 1965-06-04
Well Total Depth: 3619.50 m
Surface Hole Latitude: 53.979412
Surface Hole Longitude: -116.719339

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-04-01 Obtained License
1965-05-16 Drill Stem Test Performed
1965-06-04 Finished Drilling
1965-06-04 Well Mode changed to Drilled and Cased
1965-06-06 Production Casing Operation Performed
1965-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-06-19 Perforation Treatment Performed - Jet Perforation
1965-08-21 Well Began Injection
1965-08-21 Well Fluid changed to Water
1965-08-21 Well Type changed to Disposal
1968-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-16 Perforation Treatment Performed - Jet Perforation
1979-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-28 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-06-19 Perforation 3544.80 3554.00 7
1979-10-28 Cement Squeeze 2659.70 2666.00 0
1965-06-19 Perforation 3563.70 3577.10 7
1965-06-19 Perforation 3604.30 3608.20 7
1965-06-19 Perforation 3577.70 3586.60 3
1965-06-19 Perforation 3590.20 3598.80 3
1965-06-19 Acid Treatment 3544.80 3608.20 0
1968-08-16 Acid Treatment 3544.80 3608.20 0
1979-10-16 Perforation 2659.70 2666.00 7
1979-10-23 Acid Treatment 2659.70 2666.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-12-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References