X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585191801002

Well Details

Well ID: 0585191801002
Loading map...
Location: 00/01-18-058-19W5/2
Location Alias: 00/01-18-58-19 W5M
Location Alias 2: 00/01-18-058-19 W5/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 19
Section: 18
County/Municipality: Yellowhead County
Well Name: CELTIC PINE CK 1-18-58-19
Operator Name: XTO Energy Canada ULC
License Number: 0424702
License Date: 2010-10-18
License Status: Amended
Spud Date: 2010-10-19
Final Drill Date: 2010-11-20
Well Total Depth: 3683.50 m
Surface Hole Latitude: 54.021104
Surface Hole Longitude: -116.812910

For data sources see[1][2]

Well History

Date Event
2010-10-18 Obtained License
2010-10-19 Well Log Performed
2010-10-22 Surface Casing Operation Performed
2010-10-27 Direction Drilling Operation Performed - Horizontal
2010-11-02 Production Casing Operation Performed
2010-11-10 Direction Drilling Operation Performed - Horizontal
2010-11-20 Finished Drilling
2010-11-20 Well Mode changed to Drilled and Cased
2010-11-23 Well Log Performed
2010-11-24 Liner Casing Operation Performed
2010-11-25 Rig Released
2010-12-07 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-08 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-13 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-14 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-15 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-15 Perforation Treatment Performed - Open-Hole Completion
2010-12-17 Well Began Production
2010-12-17 Well Fluid changed to Crude Oil
2010-12-17 Well Mode changed to Pumping
2015-07-01 Well Fluid changed to Crude Oil
2015-07-01 Well Mode changed to Suspended
2016-04-01 Well Fluid changed to Crude Oil
2016-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-27 1884.00 Horizontal
2010-11-10 2918.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-07 Multi-Stage Fracture 3659.50 3662.70 0
2010-12-15 Multi-Stage Fracture 2733.90 2735.50 0
2010-12-15 Multi-Stage Fracture 2626.70 2628.30 0
2010-12-15 Multi-Stage Fracture 2514.00 2515.60 0
2010-12-15 Multi-Stage Fracture 2441.60 2443.20 0
2010-12-15 Open Hole/Barefoot Completion 3679.10 3683.50 0
2010-12-07 Multi-Stage Fracture 3600.20 3601.80 0
2010-12-08 Multi-Stage Fracture 3501.20 3502.80 0
2010-12-08 Multi-Stage Fracture 3376.30 3377.90 0
2010-12-13 Multi-Stage Fracture 3264.40 3266.00 0
2010-12-13 Multi-Stage Fracture 3165.40 3167.00 0
2010-12-14 Multi-Stage Fracture 3053.50 3055.10 0
2010-12-15 Multi-Stage Fracture 2954.60 2956.20 0
2010-12-15 Multi-Stage Fracture 2836.80 2838.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 72 0.0 0.0 0.0
2011 2082 0.0 0.0 0.0
2012 7198 0.0 0.0 0.0
2013 4930 0.0 0.0 0.0
2014 3932 0.0 0.0 0.0
2016 96 0.0 0.0 0.0
2017 5224 0.0 0.0 0.0
2018 7673 0.0 0.0 0.0
2019 612 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References