If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0585201511002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.01572,"lon":-116.890493,"icon":""}]} |
| Location: 00/11-15-058-20W5/2 | |
| Location Alias: 00/11-15-58-20 W5M | |
| Location Alias 2: 00/11-15-058-20 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 058 | |
| Meridian: 5 | |
| Range: 20 | |
| Section: 15 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: ACL PINE CK 11-15-58-20 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0024859 | |
| License Date: 1963-09-30 | |
| License Status: Issued | |
| Spud Date: 1963-10-12 | |
| Final Drill Date: 1963-12-23 | |
| Well Total Depth: 3302.50 m | |
| Surface Hole Latitude: 54.015720 | |
| Surface Hole Longitude: -116.890493 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1963-09-30 | Obtained License |
| 1963-12-16 | Drill Stem Test Performed |
| 1963-12-19 | Drill Stem Test Performed |
| 1963-12-21 | Drill Stem Test Performed |
| 1963-12-23 | Finished Drilling |
| 1963-12-24 | Production Casing Operation Performed |
| 1966-08-12 | Perforation Treatment Performed - Jet Perforation |
| 1966-08-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1974-05-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1976-03-12 | Perforation Treatment Performed - Jet Perforation |
| 1976-03-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1976-03-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1976-03-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1976-03-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1976-03-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1976-03-24 | Perforation Treatment Performed - Jet Perforation |
| 1976-03-26 | Perforation Treatment Performed - Jet Perforation |
| 1976-03-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1976-05-01 | Well Mode changed to Drilled and Cased |
| 1976-05-12 | Perforation Treatment Performed - Jet Perforation |
| 1976-05-13 | Perforation Treatment Performed - Cement Squeeze |
| 1976-05-13 | Perforation Treatment Performed - Jet Perforation |
| 1976-05-14 | Perforation Treatment Performed - Cement Squeeze |
| 1976-05-14 | Perforation Treatment Performed - Jet Perforation |
| 1976-05-17 | Perforation Treatment Performed - Jet Perforation |
| 1976-05-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1976-05-19 | Perforation Treatment Performed - Jet Perforation |
| 1976-05-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1976-05-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1976-05-20 | Perforation Treatment Performed - Jet Perforation |
| 1976-05-22 | Perforation Treatment Performed - Cement Squeeze |
| 1976-05-25 | Perforation Treatment Performed - Jet Perforation |
| 1976-05-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1978-06-08 | Perforation Treatment Performed - Cement Squeeze |
| 1978-06-14 | Perforation Treatment Performed - Cement Squeeze |
| 1978-06-19 | Perforation Treatment Performed - Jet Perforation |
| 1978-06-21 | Perforation Treatment Performed - Cement Squeeze |
| 1978-07-01 | Perforation Treatment Performed - Jet Perforation |
| 1978-07-19 | Perforation Treatment Performed - Fractured |
| 1985-06-01 | Well Began Production |
| 1985-06-01 | Well Fluid changed to Gas |
| 1985-06-01 | Well Mode changed to Flowing |
| 2013-07-04 | Well Fluid changed to Gas |
| 2013-07-04 | Well Mode changed to Pumping |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1966-08-12 | Perforation | 3235.80 | 3240.00 | 7 |
| 1976-03-24 | Perforation | 2540.80 | 2541.40 | 7 |
| 1976-03-24 | Perforation | 2542.90 | 2545.70 | 7 |
| 1976-03-24 | Perforation | 2546.60 | 2549.00 | 7 |
| 1976-03-24 | Packing Device Capped w/Cement | 2507.00 | 2514.60 | 0 |
| 1976-03-26 | Perforation | 2457.30 | 2457.90 | 13 |
| 1976-03-26 | Perforation | 2459.70 | 2461.60 | 13 |
| 1976-03-27 | Acid Treatment | 2457.30 | 2461.60 | 0 |
| 1976-05-12 | Perforation | 2375.90 | 2379.00 | 3 |
| 1976-05-13 | Cement Squeeze | 2375.90 | 2379.00 | 0 |
| 1976-05-13 | Perforation | 1892.80 | 1895.90 | 3 |
| 1966-08-12 | Perforation | 3242.80 | 3245.80 | 7 |
| 1976-05-14 | Cement Squeeze | 1892.80 | 1895.90 | 0 |
| 1976-05-14 | Perforation | 1810.50 | 1813.60 | 3 |
| 1976-05-14 | Cement Squeeze | 1810.50 | 1813.60 | 0 |
| 1976-05-17 | Perforation | 1853.20 | 1856.20 | 7 |
| 1976-05-18 | Acid Treatment | 1853.20 | 1856.20 | 0 |
| 1976-05-19 | Perforation | 1856.20 | 1868.40 | 7 |
| 1976-05-20 | Acid Treatment | 1853.20 | 1868.40 | 0 |
| 1976-05-20 | Packing Device Capped w/Cement | 1792.20 | 1801.40 | 0 |
| 1976-05-20 | Perforation | 1606.30 | 1609.30 | 3 |
| 1976-05-22 | Cement Squeeze | 1606.30 | 1609.30 | 0 |
| 1966-08-13 | Acid Treatment | 3235.80 | 3245.80 | 0 |
| 1976-05-25 | Perforation | 1649.00 | 1653.20 | 7 |
| 1976-05-26 | Acid Treatment | 1649.00 | 1653.20 | 0 |
| 1978-06-08 | Cement Squeeze | 1649.00 | 1653.20 | 0 |
| 1978-06-14 | Cement Squeeze | 1606.30 | 1609.30 | 0 |
| 1978-06-19 | Perforation | 1853.20 | 1868.40 | 7 |
| 1978-06-21 | Cement Squeeze | 1853.20 | 1868.40 | 0 |
| 1978-07-01 | Perforation | 2457.30 | 2457.90 | 13 |
| 1978-07-01 | Perforation | 2459.70 | 2461.60 | 13 |
| 1978-07-19 | Fracture | 2457.30 | 2461.60 | 0 |
| 1974-05-20 | Packing Device Capped w/Cement | 3185.80 | 3185.80 | 0 |
| 1976-03-12 | Perforation | 2956.30 | 2958.10 | 13 |
| 1976-03-15 | Acid Treatment | 2956.30 | 2958.10 | 0 |
| 1976-03-20 | Acid Treatment | 2956.30 | 2958.10 | 0 |
| 1976-03-21 | Acid Treatment | 2956.30 | 2958.10 | 0 |
| 1976-03-21 | Packing Device Capped w/Cement | 2871.20 | 2926.10 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1985 | 1435 | 0.0 | 0.0 | 0.0 |
| 1986 | 4197 | 0.0 | 0.0 | 0.0 |
| 1987 | 3164 | 0.0 | 0.0 | 0.0 |
| 1988 | 6338 | 0.0 | 0.0 | 0.0 |
| 1989 | 3425 | 0.0 | 0.0 | 0.0 |
| 1990 | 3751 | 0.0 | 0.0 | 0.0 |
| 1991 | 5725 | 0.0 | 0.0 | 0.0 |
| 1992 | 5081 | 0.0 | 0.0 | 0.0 |
| 1993 | 4886 | 0.0 | 0.0 | 0.0 |
| 1994 | 7951 | 0.0 | 0.0 | 0.0 |
| 1995 | 7677 | 0.0 | 0.0 | 0.0 |
| 1996 | 8531 | 0.0 | 0.0 | 0.0 |
| 1997 | 8421 | 0.0 | 0.0 | 0.0 |
| 1998 | 7362 | 0.0 | 0.0 | 0.0 |
| 1999 | 4581 | 0.0 | 0.0 | 0.0 |
| 2000 | 8383 | 0.0 | 0.0 | 0.0 |
| 2001 | 7905 | 0.0 | 0.0 | 0.0 |
| 2002 | 8573 | 0.0 | 0.0 | 0.0 |
| 2003 | 8522 | 0.0 | 0.0 | 0.0 |
| 2004 | 7711 | 0.0 | 0.0 | 0.0 |
| 2005 | 8706 | 0.0 | 0.0 | 0.0 |
| 2006 | 8447 | 0.0 | 0.0 | 0.0 |
| 2007 | 8728 | 0.0 | 0.0 | 0.0 |
| 2008 | 8518 | 0.0 | 0.0 | 0.0 |
| 2009 | 8240 | 0.0 | 0.0 | 0.0 |
| 2010 | 7874 | 0.0 | 0.0 | 0.0 |
| 2011 | 7165 | 0.0 | 0.0 | 0.0 |
| 2012 | 7156 | 0.0 | 0.0 | 0.0 |
| 2013 | 7291 | 0.0 | 0.0 | 0.0 |
| 2014 | 7008 | 0.0 | 0.0 | 0.0 |
| 2015 | 7844 | 0.0 | 0.0 | 0.0 |
| 2016 | 7356 | 0.0 | 0.0 | 0.0 |
| 2017 | 6799 | 0.0 | 0.0 | 0.0 |
For data sources see[5]