If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0585202601S00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.05058,"lon":-116.850196,"icon":""}]} |
| Location: S0/01-26-058-20W5/0 | |
| Location Alias: S0/01-26-58-20 W5M | |
| Location Alias 2: S0/01-26-058-20 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 058 | |
| Meridian: 5 | |
| Range: 20 | |
| Section: 26 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: ACL KAYBOBS 1-26-58-20 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0435115 | |
| License Date: 2011-07-13 | |
| License Status: Amended | |
| Spud Date: 2011-08-30 | |
| Final Drill Date: 2011-09-29 | |
| Well Total Depth: 3841.00 m | |
| Surface Hole Latitude: 54.050580 | |
| Surface Hole Longitude: -116.850196 |
| Date | Event |
|---|---|
| 2011-07-13 | Obtained License |
| 2011-08-03 | Well Log Performed |
| 2011-09-03 | Surface Casing Operation Performed |
| 2011-09-04 | Well Log Performed |
| 2011-09-06 | Direction Drilling Operation Performed - Deviate |
| 2011-09-07 | Well Log Performed |
| 2011-09-13 | Direction Drilling Operation Performed - Horizontal |
| 2011-09-15 | Intermediate Casing Operation Performed |
| 2011-09-18 | Well Log Performed |
| 2011-09-29 | Finished Drilling |
| 2011-09-29 | Well Mode changed to Drilled and Cased |
| 2011-10-02 | Liner Casing Operation Performed |
| 2011-10-02 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-10-04 | Rig Released |
| 2011-10-09 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-10-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-10-15 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-10-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-11-09 | Well Began Production |
| 2011-11-09 | Well Fluid changed to Gas |
| 2011-11-09 | Well Mode changed to Flowing |
| 2012-07-11 | Well Log Performed |
| 2016-12-04 | Well Fluid changed to Gas |
| 2016-12-04 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-09-06 | 1564.00 | Deviate (5 - 79 degrees) |
| 2011-09-13 | 2431.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-10-02 | Open Hole/Barefoot Completion | 3833.00 | 3841.00 | 0 |
| 2011-10-16 | Multi-Stage Fracture | 2894.40 | 2894.50 | 0 |
| 2011-10-16 | Multi-Stage Fracture | 2984.40 | 2984.50 | 0 |
| 2011-10-16 | Multi-Stage Fracture | 3075.20 | 3075.30 | 0 |
| 2011-10-16 | Multi-Stage Fracture | 3165.90 | 3166.00 | 0 |
| 2011-10-09 | Multi-Stage Fracture | 3795.30 | 3795.40 | 0 |
| 2011-10-13 | Multi-Stage Fracture | 3583.90 | 3584.00 | 0 |
| 2011-10-15 | Multi-Stage Fracture | 3256.80 | 3256.90 | 0 |
| 2011-10-15 | Multi-Stage Fracture | 3332.70 | 3332.80 | 0 |
| 2011-10-15 | Multi-Stage Fracture | 3395.00 | 3395.10 | 0 |
| 2011-10-16 | Multi-Stage Fracture | 2550.60 | 2550.70 | 0 |
| 2011-10-16 | Multi-Stage Fracture | 2640.80 | 2640.90 | 0 |
| 2011-10-16 | Multi-Stage Fracture | 2760.50 | 2760.60 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 1263 | 0.0 | 0.0 | 0.0 |
| 2012 | 7105 | 0.0 | 0.0 | 0.0 |
| 2013 | 6818 | 0.0 | 0.0 | 0.0 |
| 2014 | 7027 | 0.0 | 0.0 | 0.0 |
| 2015 | 7724 | 0.0 | 0.0 | 0.0 |
| 2016 | 7915 | 0.0 | 0.0 | 0.0 |
| 2017 | 7717 | 0.0 | 0.0 | 0.0 |
| 2018 | 7418 | 0.0 | 0.0 | 0.0 |
| 2019 | 7890 | 0.0 | 0.0 | 0.0 |
| 2020 | 1036 | 0.0 | 0.0 | 0.0 |
For data sources see[6]