If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0585202807000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.042019,"lon":-116.909762,"icon":""}]} |
Location: 00/07-28-058-20W5/0 | |
Location Alias: 00/07-28-58-20 W5M | |
Location Alias 2: 00/07-28-058-20 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 5 | |
Range: 20 | |
Section: 28 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: 2214896AB PINE CK 7-28-58-20 | |
Operator Name: 2214896 Alberta Ltd. | |
License Number: 0225292 | |
License Date: 1999-08-12 | |
License Status: Abandoned | |
Spud Date: 1999-09-05 | |
Final Drill Date: 1999-09-28 | |
Well Total Depth: 3163.00 m | |
Surface Hole Latitude: 54.042019 | |
Surface Hole Longitude: -116.909762 |
Date | Event |
---|---|
1999-08-12 | Obtained License |
1999-09-08 | Surface Casing Operation Performed |
1999-09-28 | Finished Drilling |
1999-09-28 | Well Log Performed |
1999-09-30 | Intermediate Casing Operation Performed |
1999-09-30 | Production Casing Operation Performed |
1999-10-01 | Rig Released |
1999-10-01 | Well Mode changed to Drilled and Cased |
1999-10-05 | Lost Circulation Occurred |
1999-12-09 | Well Log Performed |
1999-12-10 | Perforation Treatment Performed - Jet Perforation |
1999-12-10 | Well Log Performed |
1999-12-11 | Perforation Treatment Performed - Jet Perforation |
1999-12-11 | Perforation Treatment Performed - Remedial Casing |
1999-12-18 | Well Log Performed |
1999-12-19 | Well Log Performed |
1999-12-20 | Perforation Treatment Performed - Jet Perforation |
2000-01-08 | Perforation Treatment Performed - Acid Wash - No Pressure |
2000-01-09 | Perforation Treatment Performed - Jet Perforation |
2000-01-10 | Perforation Treatment Performed - Cement Squeeze |
2000-01-11 | Perforation Treatment Performed - Jet Perforation |
2000-01-12 | Perforation Treatment Performed - Acid Wash - No Pressure |
2000-06-26 | Well Began Production |
2000-06-26 | Well Fluid changed to Gas |
2000-06-26 | Well Mode changed to Flowing |
2004-06-01 | Well Fluid changed to Gas |
2004-06-01 | Well Mode changed to Pumping |
2011-01-11 | Perforation Treatment Performed - Cement Plug |
2011-01-11 | Perforation Treatment Performed - Jet Perforation |
2011-01-11 | Plug Back Performed |
2011-01-11 | Well Fluid changed to Gas |
2011-01-11 | Well Mode changed to Abandoned Zone |
2011-01-12 | Perforation Treatment Performed - Cement Plug |
2011-01-12 | Perforation Treatment Performed - Remedial Casing |
2011-01-13 | Well Abandoned |
2011-01-13 | Well Fluid changed to Gas |
2011-01-13 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-12-10 | Perforation | 2932.00 | 2932.70 | 20 |
2000-01-11 | Perforation | 2919.00 | 2920.00 | 20 |
2000-01-11 | Perforation | 2979.50 | 2982.00 | 20 |
2000-01-12 | Acid Wash | 2919.00 | 2982.00 | 0 |
2011-01-11 | Cement Plug | 1362.00 | 1498.00 | 0 |
2011-01-11 | Perforation | 512.00 | 513.00 | 20 |
2011-01-12 | Remedial Casing Cementing | 512.00 | 513.00 | 0 |
2011-01-12 | Cement Plug | 412.00 | 540.00 | 0 |
1999-12-11 | Perforation | 2950.00 | 2950.70 | 20 |
1999-12-11 | Remedial Casing Cementing | 2932.00 | 2950.70 | 0 |
1999-12-20 | Perforation | 3092.80 | 3095.80 | 20 |
1999-12-20 | Perforation | 3093.20 | 3096.20 | 20 |
2000-01-08 | Acid Wash | 3092.80 | 3096.20 | 0 |
2000-01-09 | Perforation | 2979.50 | 2980.20 | 13 |
2000-01-10 | Cement Squeeze | 3092.80 | 3096.20 | 0 |
2000-01-10 | Cement Squeeze | 2979.50 | 2980.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 2252 | 0.0 | 0.0 | 0.0 |
2001 | 7691 | 0.0 | 0.0 | 0.0 |
2002 | 7775 | 0.0 | 0.0 | 0.0 |
2003 | 8396 | 0.0 | 0.0 | 0.0 |
2004 | 8115 | 0.0 | 0.0 | 0.0 |
2005 | 6734 | 0.0 | 0.0 | 0.0 |
2006 | 7080 | 0.0 | 0.0 | 0.0 |
2007 | 8039 | 0.0 | 0.0 | 0.0 |
2008 | 5039 | 0.0 | 0.0 | 0.0 |
2009 | 2064 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1999-10-05 | Lost Circulation | 59.00 | 475.00 |
For data sources see[6]