X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0586013313002

Well Details

Well ID: 0586013313002
Loading map...
Location: 00/13-33-058-01W6/2
Location Alias: 00/13-33-58-01 W6M
Location Alias 2: 00/13-33-058-01 W6/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 6
Range: 01
Section: 33
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ SMOKY 13-33-58-1
Operator Name: XTO Energy Canada ULC
License Number: 0440120
License Date: 2011-12-01
License Status: Amended
Spud Date: 2011-12-29
Final Drill Date: 2012-02-23
Well Total Depth: 4905.00 m
Surface Hole Latitude: 54.077637
Surface Hole Longitude: -118.096178

For data sources see[1][2]

Well History

Date Event
2011-12-01 Obtained License
2012-01-02 Surface Casing Operation Performed
2012-01-26 Production Casing Operation Performed
2012-02-03 Direction Drilling Operation Performed - Horizontal
2012-02-04 Well Log Performed
2012-02-06 Well Log Performed
2012-02-23 Finished Drilling
2012-02-23 Well Mode changed to Drilled and Cased
2012-02-27 Liner Casing Operation Performed
2012-02-27 Perforation Treatment Performed - Open-Hole Completion
2012-02-29 Rig Released
2012-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-10 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-11 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-13 Well Fluid changed to Gas
2012-03-13 Well Mode changed to Testing
2012-09-27 Well Began Production
2012-09-27 Well Fluid changed to Gas
2012-09-27 Well Mode changed to Flowing
2013-03-02 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-02-03 3416.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-27 Open Hole/Barefoot Completion 4900.00 4905.00 0
2012-03-11 Multi-Stage Fracture 4276.90 4277.20 0
2012-03-11 Multi-Stage Fracture 4201.20 4201.50 0
2012-03-12 Multi-Stage Fracture 4121.70 4122.00 0
2012-03-12 Multi-Stage Fracture 4032.00 4032.30 0
2012-03-12 Multi-Stage Fracture 3950.10 3951.80 0
2012-03-12 Multi-Stage Fracture 3872.20 3873.90 0
2012-03-12 Multi-Stage Fracture 3792.30 3794.00 0
2012-03-13 Multi-Stage Fracture 3712.50 3714.10 0
2012-03-13 Multi-Stage Fracture 3632.60 3634.30 0
2012-03-13 Multi-Stage Fracture 3581.90 3583.60 0
2012-03-09 Multi-Stage Fracture 4890.00 4891.30 0
2012-03-10 Multi-Stage Fracture 4833.30 4835.00 0
2012-03-10 Multi-Stage Fracture 4755.80 4756.20 0
2012-03-10 Multi-Stage Fracture 4680.30 4680.60 0
2012-03-11 Multi-Stage Fracture 4600.80 4601.10 0
2012-03-11 Multi-Stage Fracture 4511.00 4511.40 0
2012-03-11 Multi-Stage Fracture 4431.50 4431.90 0
2012-03-11 Multi-Stage Fracture 4356.40 4356.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1287 0.0 0.0 0.0
2013 6655 0.0 0.0 0.0
2014 6717 0.0 0.0 0.0
2015 6747 0.0 0.0 0.0
2016 7792 0.0 0.0 0.0
2017 6669 0.0 0.0 0.0
2018 7101 0.0 0.0 0.0
2019 835 0.0 0.0 0.0
2020 1846 0.0 0.0 0.0

For data sources see[6]

References