X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0594172709000

Well Details

Well ID: 0594172709000
Loading map...
Location: 00/09-27-059-17W4/0
Location Alias: 00/09-27-59-17 W4M
Location Alias 2: 00/09-27-059-17 W4/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 4
Range: 17
Section: 27
County/Municipality: Smoky Lake County
Well Name: CNRL BELLIS 9-27-59-17
Operator Name: Canadian Natural Resources Limited
License Number: 0171867
License Date: 1994-10-26
License Status: RecCertified
Spud Date: 1994-10-30
Final Drill Date: 1994-11-01
Well Total Depth: 619.50 m
Surface Hole Latitude: 54.130238
Surface Hole Longitude: -112.456583

For data sources see[1][2]

Well History

Date Event
1994-10-26 Obtained License
1994-10-31 Direction Drilling Operation Performed - Deviate
1994-10-31 Surface Casing Operation Performed
1994-11-01 Finished Drilling
1994-11-01 Well Mode changed to Drilled and Cased
1994-11-02 Production Casing Operation Performed
1994-11-02 Well Log Performed
1994-11-03 Rig Released
1994-11-11 Perforation Treatment Performed - Cement Plug
1994-11-11 Perforation Treatment Performed - Jet Perforation
1994-11-11 Perforation Treatment Performed - Open-Hole Completion
1994-11-14 Well Log Performed
1994-12-01 Well Began Production
1994-12-01 Well Fluid changed to Gas
1994-12-01 Well Mode changed to Flowing
1996-02-25 Well Log Performed
2003-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-11 Plug Back Performed
2003-06-11 Well Fluid changed to Gas
2003-06-11 Well Mode changed to Abandoned Zone
2003-06-12 Well Log Performed
2003-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-13 Perforation Treatment Performed - Cement Squeeze
2003-06-13 Plug Back Performed
2003-12-03 Perforation Treatment Performed - Jet Perforation
2003-12-12 Perforation Treatment Performed - Remedial Casing
2003-12-18 Perforation Treatment Performed - Jet Perforation
2003-12-18 Perforation Treatment Performed - Remedial Casing
2003-12-18 Well Log Performed
2004-06-14 Well Log Performed
2004-08-10 Perforation Treatment Performed - Jet Perforation
2004-08-10 Well Log Performed
2004-08-11 Perforation Treatment Performed - Remedial Casing
2004-10-16 Perforation Treatment Performed - Jet Perforation
2004-10-16 Well Log Performed
2004-10-17 Perforation Treatment Performed - Remedial Casing
2005-06-04 Perforation Treatment Performed - Jet Perforation
2005-06-04 Well Log Performed
2005-06-05 Perforation Treatment Performed - Remedial Casing
2005-10-20 Perforation Treatment Performed - Jet Perforation
2005-10-21 Perforation Treatment Performed - Cement Plug
2005-10-21 Perforation Treatment Performed - Remedial Casing
2005-10-30 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-10-31 145.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-11-11 Open Hole/Barefoot Completion 611.00 619.50 0
2003-12-12 Remedial Casing Cementing 335.00 338.00 0
2003-12-18 Perforation 335.00 338.00 17
2003-12-18 Remedial Casing Cementing 335.00 338.00 0
2004-08-10 Perforation 245.00 248.00 13
2004-08-11 Remedial Casing Cementing 245.00 248.00 0
2004-10-16 Perforation 215.00 218.00 13
2004-10-17 Remedial Casing Cementing 215.00 218.00 0
2005-06-04 Perforation 163.00 166.00 14
2005-06-05 Remedial Casing Cementing 163.00 166.00 0
2005-10-20 Perforation 160.00 166.00 99
1994-11-11 Cement Plug 618.50 619.50 0
2005-10-21 Remedial Casing Cementing 160.00 166.00 0
2005-10-21 Cement Plug 129.00 166.00 0
1994-11-11 Open Hole/Barefoot Completion 611.00 618.50 0
1994-11-11 Perforation 500.00 501.00 19
1994-11-11 Perforation 503.00 504.00 19
2003-06-11 Packing Device Capped w/Cement 593.00 601.50 0
2003-06-13 Cement Squeeze 500.00 504.40 0
2003-06-13 Packing Device Capped w/Cement 474.00 497.40 0
2003-12-03 Perforation 335.00 338.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 378 0.0 0.0 0.0
1995 7564 0.0 0.0 0.0
1996 3983 0.0 0.0 0.0
1997 29 0.0 0.0 0.0

For data sources see[6]

References