X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595091213000

Well Details

Well ID: 0595091213000
Loading map...
Location: 00/13-12-059-09W5/0
Location Alias: 00/13-12-59-09 W5M
Location Alias 2: 00/13-12-059-09 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 09
Section: 12
County/Municipality: Woodlands County
Well Name: CNRES GREENCOURT 13-12-59-9
Operator Name: Canadian Natural Resources Limited
License Number: 0184434
License Date: 1996-01-11
License Status: Suspension
Spud Date: 1996-01-13
Final Drill Date: 1996-01-22
Well Total Depth: 1522.00 m
Surface Hole Latitude: 54.093443
Surface Hole Longitude: -115.222731

For data sources see[1][2]

Well History

Date Event
1996-01-11 Obtained License
1996-01-14 Surface Casing Operation Performed
1996-01-16 Direction Drilling Operation Performed - Deviate
1996-01-21 Lost Circulation Occurred
1996-01-22 Finished Drilling
1996-01-22 Well Log Performed
1996-01-22 Well Mode changed to Drilled and Cased
1996-01-23 Well Log Performed
1996-01-24 Drill Stem Test Performed
1996-01-27 Production Casing Operation Performed
1996-01-28 Rig Released
1996-02-02 Well Log Performed
1996-02-03 Perforation Treatment Performed - Jet Perforation
1996-02-03 Well Log Performed
1996-02-05 Well Log Performed
1996-02-06 Perforation Treatment Performed - Jet Perforation
1996-02-06 Well Log Performed
1996-02-08 Well Log Performed
1996-02-10 Well Log Performed
1996-02-17 Well Began Production
1996-02-17 Well Fluid changed to Crude Oil
1996-02-17 Well Mode changed to Pumping
1996-12-07 Well Log Performed
1996-12-09 Perforation Treatment Performed - Jet Perforation
1996-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-12-12 Well Log Performed
1996-12-13 Perforation Treatment Performed - Jet Perforation
1996-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-16 Perforation Treatment Performed - Jet Perforation
2000-02-16 Well Log Performed
2000-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-25 Plug Back Performed
2000-02-25 Well Fluid changed to Crude Oil
2000-02-25 Well Log Performed
2000-02-25 Well Mode changed to Abandoned Zone
2003-06-05 Perforation Treatment Performed - Jet Perforation
2003-06-05 Well Log Performed
2006-08-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-08-13 Plug Back Performed
2006-08-14 Well Log Performed
2006-08-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-08-15 Perforation Treatment Performed - Jet Perforation
2006-08-15 Perforation Treatment Performed - Remedial Casing
2006-08-15 Well Log Performed
2006-08-16 Perforation Treatment Performed - Cement Plug
2006-08-16 Perforation Treatment Performed - Remedial Casing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-01-16 854.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-02-03 Perforation 1489.00 1491.00 17
2000-02-16 Perforation 1451.00 1453.00 17
2000-02-22 Acid Treatment 1449.00 1453.00 0
2000-02-25 Packing Device Capped w/Cement 1438.00 1446.00 0
2003-06-05 Perforation 1269.50 1271.00 20
2006-08-13 Packing Device Capped w/Cement 1254.00 1262.00 0
2006-08-15 Perforation 542.00 545.00 14
2006-08-15 Perforation 381.00 384.00 14
2006-08-15 Remedial Casing Cementing 542.00 545.00 0
2006-08-15 Packing Device Capped w/Cement 528.00 538.00 0
2006-08-16 Remedial Casing Cementing 381.00 384.00 0
1996-02-06 Perforation 1475.00 1478.00 17
2006-08-16 Cement Plug 334.00 389.00 0
1996-02-06 Perforation 1481.00 1483.00 17
1996-12-09 Perforation 1462.50 1464.00 17
1996-12-11 Acid Treatment 1462.50 1464.00 0
1996-12-12 Packing Device Capped w/Cement 1467.00 1473.00 0
1996-12-13 Perforation 1455.00 1456.50 17
1996-12-14 Acid Treatment 1455.00 1456.50 0
2000-02-16 Perforation 1449.00 1450.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 6008 0.0 0.0 0.0
1997 1133 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-01-21 Lost Circulation 1486.00 1522.00

For data sources see[7]

References