X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595091310000

Well Details

Well ID: 0595091310000
Loading map...
Location: 00/10-13-059-09W5/0
Location Alias: 00/10-13-59-09 W5M
Location Alias 2: 00/10-13-059-09 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 09
Section: 13
County/Municipality: Woodlands County
Well Name: CNRES GREENCOURT 10-13-59-9
Operator Name: Canadian Natural Resources Limited
License Number: 0181682
License Date: 1995-10-26
License Status: Abandoned
Spud Date: 1995-11-26
Final Drill Date: 1995-12-03
Well Total Depth: 1501.00 m
Surface Hole Latitude: 54.102304
Surface Hole Longitude: -115.212422

For data sources see[1][2]

Well History

Date Event
1995-10-26 Obtained License
1995-11-27 Surface Casing Operation Performed
1995-12-03 Finished Drilling
1995-12-03 Well Log Performed
1995-12-03 Well Mode changed to Drilled and Cased
1995-12-04 Drill Stem Test Performed
1995-12-04 Well Log Performed
1995-12-08 Drill Stem Test Performed
1995-12-11 Production Casing Operation Performed
1995-12-11 Rig Released
1995-12-11 Well Log Performed
1995-12-21 Well Log Performed
1996-01-03 Well Log Performed
1996-01-04 Perforation Treatment Performed - Jet Perforation
1996-01-22 Well Began Production
1996-01-22 Well Fluid changed to Crude Oil
1996-01-22 Well Mode changed to Pumping
1998-02-01 Perforation Treatment Performed - Jet Perforation
1998-02-01 Well Log Performed
1998-02-04 Well Log Performed
1998-02-05 Perforation Treatment Performed - Cement Squeeze
1998-02-10 Perforation Treatment Performed - Jet Perforation
1998-02-10 Well Log Performed
1998-02-11 Perforation Treatment Performed - Jet Perforation
1998-02-11 Well Log Performed
1998-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-06 Perforation Treatment Performed - Jet Perforation
2000-02-06 Well Log Performed
2003-06-01 Perforation Treatment Performed - Jet Perforation
2003-06-01 Well Log Performed
2003-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-06-05 Perforation Treatment Performed - Jet Perforation
2003-06-05 Well Log Performed
2004-05-31 Well Fluid changed to Crude Oil
2004-05-31 Well Mode changed to Suspended
2007-08-09 Perforation Treatment Performed - Cement Plug
2007-08-09 Plug Back Performed
2007-08-09 Well Fluid changed to Crude Oil
2007-08-09 Well Mode changed to Abandoned Zone
2007-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-08-10 Plug Back Performed
2007-08-22 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-01-04 Perforation 1474.00 1475.50 17
2003-06-05 Perforation 1440.00 1441.00 17
2003-06-05 Perforation 1443.00 1445.00 17
2003-06-05 Perforation 1446.00 1447.00 17
2007-08-09 Cement Plug 1452.00 1460.00 0
2007-08-10 Packing Device Capped w/Cement 1422.00 1430.00 0
1998-02-01 Perforation 1470.00 1472.00 17
1998-02-05 Cement Squeeze 1470.00 1475.50 0
1998-02-10 Perforation 1469.00 1471.00 17
1998-02-11 Perforation 1468.00 1469.00 17
1998-02-15 Acid Treatment 1468.00 1469.00 0
2000-02-06 Perforation 1462.00 1463.00 17
2003-06-01 Perforation 1448.50 1450.00 17
2003-06-04 Acid Treatment 1448.50 1450.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 7155 0.0 0.0 0.0
1997 7599 0.0 0.0 0.0
1998 6714 0.0 0.0 0.0
1999 7619 0.0 0.0 0.0
2000 6969 0.0 0.0 0.0
2001 4072 0.0 0.0 0.0
2002 8092 0.0 0.0 0.0
2003 2290 0.0 0.0 0.0

For data sources see[5]

References