If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595092510002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.132307,"lon":-115.211004,"icon":""}]} |
Location: 00/10-25-059-09W5/2 | |
Location Alias: 00/10-25-59-09 W5M | |
Location Alias 2: 00/10-25-059-09 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 09 | |
Section: 25 | |
County/Municipality: Woodlands County | |
Well Name: CNRL GNCOURT 10-25-59-9 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0023046 | |
License Date: 1962-09-24 | |
License Status: Suspension | |
Spud Date: 1962-09-30 | |
Final Drill Date: 1962-10-12 | |
Well Total Depth: 1474.00 m | |
Surface Hole Latitude: 54.132307 | |
Surface Hole Longitude: -115.211004 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1962-09-24 | Obtained License |
1962-10-09 | Drill Stem Test Performed |
1962-10-12 | Finished Drilling |
1962-10-12 | Well Mode changed to Drilled and Cased |
1962-10-13 | Drill Stem Test Performed |
1962-10-14 | Drill Stem Test Performed |
1962-10-15 | Production Casing Operation Performed |
1969-07-10 | Perforation Treatment Performed - Bullet Perforation |
1969-07-13 | Perforation Treatment Performed - Acid Wash - No Pressure |
1969-07-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1971-06-23 | Well Began Production |
1971-06-23 | Well Fluid changed to Gas |
1971-06-23 | Well Mode changed to Flowing |
1974-10-18 | Perforation Treatment Performed - Cement Squeeze |
1974-10-19 | Perforation Treatment Performed - Cement Squeeze |
1974-10-21 | Perforation Treatment Performed - Jet Perforation |
1974-10-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1974-11-28 | Perforation Treatment Performed - Cement Squeeze |
1974-12-04 | Perforation Treatment Performed - Jet Perforation |
1974-12-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1974-12-13 | Perforation Treatment Performed - Cement Squeeze |
1974-12-13 | Perforation Treatment Performed - Condensate Squeeze |
1985-11-01 | Well Structure changed to Commingled |
2000-06-26 | Well Log Performed |
2000-06-27 | Perforation Treatment Performed - Jet Perforation |
2000-06-27 | Well Log Performed |
2000-06-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1969-07-10 | Bullet Perforation | 1440.50 | 1450.20 | 7 |
1974-10-24 | Acid Treatment | 1436.20 | 1437.70 | 0 |
1974-11-28 | Cement Squeeze | 1436.20 | 1437.70 | 0 |
1974-12-04 | Perforation | 1439.90 | 1441.70 | 7 |
1974-12-10 | Acid Treatment | 1439.90 | 1441.70 | 0 |
1974-12-13 | Condensate Squeeze | 1439.90 | 1441.70 | 0 |
1974-12-13 | Cement Squeeze | 1439.90 | 1441.70 | 0 |
2000-06-27 | Perforation | 1411.30 | 1413.50 | 20 |
2000-06-28 | Acid Treatment | 1411.30 | 1413.50 | 0 |
1969-07-10 | Bullet Perforation | 1417.90 | 1424.60 | 7 |
1969-07-13 | Acid Wash | 1417.90 | 1450.20 | 0 |
1969-07-20 | Acid Treatment | 1417.90 | 1450.20 | 0 |
1974-10-18 | Cement Squeeze | 1440.50 | 1450.20 | 0 |
1974-10-18 | Cement Squeeze | 1440.50 | 1450.20 | 0 |
1974-10-19 | Cement Squeeze | 1440.50 | 1450.20 | 0 |
1974-10-21 | Perforation | 1436.20 | 1437.70 | 13 |
1974-10-24 | Acid Treatment | 1436.20 | 1437.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1971 | 2014 | 0.0 | 0.0 | 0.0 |
1972 | 7758 | 0.0 | 0.0 | 0.0 |
1973 | 7735 | 0.0 | 0.0 | 0.0 |
1974 | 8178 | 0.0 | 0.0 | 0.0 |
1975 | 8503 | 0.0 | 0.0 | 0.0 |
1976 | 7477 | 0.0 | 0.0 | 0.0 |
1977 | 3091 | 0.0 | 0.0 | 0.0 |
1978 | 918 | 0.0 | 0.0 | 0.0 |
1979 | 959 | 0.0 | 0.0 | 0.0 |
1983 | 1249 | 0.0 | 0.0 | 0.0 |
1984 | 4214 | 0.0 | 0.0 | 0.0 |
1985 | 6774 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-06-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]