X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595093602000

Well Details

Well ID: 0595093602000
Loading map...
Location: 00/02-36-059-09W5/0
Location Alias: 00/02-36-59-09 W5M
Location Alias 2: 00/02-36-059-09 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 09
Section: 36
County/Municipality: Woodlands County
Well Name: CNRL UNIT GREENCOURT 2-36-59-9
Operator Name: Canadian Natural Resources Limited
License Number: 0052629
License Date: 1975-01-27
License Status: Issued
Spud Date: 1975-01-28
Final Drill Date: 1975-02-05
Well Total Depth: 1474.60 m
Surface Hole Latitude: 54.139537
Surface Hole Longitude: -115.211018

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-01-27 Obtained License
1975-02-05 Finished Drilling
1975-02-06 Drill Stem Test Performed
1975-02-07 Drill Stem Test Performed
1975-02-07 Production Casing Operation Performed
1975-08-09 Perforation Treatment Performed - Jet Perforation
1975-08-15 Perforation Treatment Performed - Cement Squeeze
1975-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-08-19 Perforation Treatment Performed - Jet Perforation
1975-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-08-23 Perforation Treatment Performed - Jet Perforation
1975-08-28 Perforation Treatment Performed - Fractured
1975-11-12 Well Mode changed to Drilled and Cased
1978-03-08 Well Began Production
1978-03-08 Well Fluid changed to Gas
1978-03-08 Well Mode changed to Flowing
1978-06-26 Well Fluid changed to Gas
1978-06-26 Well Mode changed to Suspended
1982-11-16 Well Fluid changed to Gas
1982-11-16 Well Mode changed to Flowing
1983-07-28 Perforation Treatment Performed - Cement Plug
1983-07-28 Perforation Treatment Performed - Cement Squeeze
1983-07-28 Well Fluid changed to Gas
1983-07-28 Well Mode changed to Abandoned Zone
1983-07-29 Perforation Treatment Performed - Jet Perforation
1983-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-08-06 Well Log Performed
2001-08-07 Perforation Treatment Performed - Jet Perforation
2001-08-07 Well Log Performed
2001-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-08-11 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-08-09 Perforation 1442.60 1445.40 7
1983-07-28 Cement Squeeze 1425.50 1428.60 0
1983-07-28 Cement Plug 1423.50 1428.60 0
1983-07-29 Perforation 1415.50 1419.20 7
1983-07-29 Perforation 1420.10 1421.60 7
1983-08-02 Acid Treatment 1415.50 1421.60 0
2001-08-07 Perforation 1422.00 1424.00 17
2001-08-07 Perforation 1425.50 1428.50 17
2001-08-09 Acid Treatment 1422.00 1428.50 0
1975-08-15 Cement Squeeze 1442.60 1445.40 0
1975-08-19 Perforation 1440.20 1441.70 7
1975-08-19 Acid Treatment 1440.20 1441.70 0
1975-08-21 Acid Treatment 1440.20 1441.70 0
1975-08-23 Perforation 1425.50 1427.10 7
1975-08-23 Perforation 1427.70 1428.60 7
1975-08-23 Acid Treatment 1425.50 1428.60 0
1975-08-28 Fracture 1425.50 1428.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 52 0.0 0.0 0.0
1976 4 0.0 0.0 0.0
1978 1108 0.0 0.0 0.0
1982 1077 0.0 0.0 0.0
1983 720 0.0 0.0 0.0

For data sources see[5]

References