If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595180913020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.079456,"lon":-116.650555,"icon":""}]} |
Location: 02/13-09-059-18W5/0 | |
Location Alias: 02/13-09-59-18 W5M | |
Location Alias 2: 02/13-09-059-18 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 18 | |
Section: 09 | |
County/Municipality: Woodlands County | |
Well Name: CELTIC 102 HZ KAYBOBS 13-9-59-18 | |
Operator Name: XTO Energy Canada ULC | |
License Number: 0413741 | |
License Date: 2009-11-06 | |
License Status: Suspension | |
Spud Date: 2009-11-17 | |
Final Drill Date: 2009-11-30 | |
Well Total Depth: 3552.00 m | |
Surface Hole Latitude: 54.079456 | |
Surface Hole Longitude: -116.650555 |
Date | Event |
---|---|
2009-11-06 | Obtained License |
2009-11-19 | Surface Casing Operation Performed |
2009-11-23 | Direction Drilling Operation Performed - Horizontal |
2009-11-30 | Finished Drilling |
2009-11-30 | Well Log Performed |
2009-11-30 | Well Mode changed to Drilled and Cased |
2009-12-04 | Well Log Performed |
2009-12-05 | Liner Casing Operation Performed |
2009-12-05 | Perforation Treatment Performed - Open-Hole Completion |
2009-12-05 | Perforation Treatment Performed - Slotted Liner or Casing |
2009-12-05 | Rig Released |
2009-12-17 | Perforation Treatment Performed - Fractured |
2010-02-24 | Well Log Performed |
2010-02-25 | Well Log Performed |
2010-03-04 | Perforation Treatment Performed - Fractured |
2010-03-04 | Well Began Production |
2010-03-04 | Well Fluid changed to Gas |
2010-03-04 | Well Mode changed to Flowing |
2011-09-01 | Well Fluid changed to Gas |
2011-09-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-11-23 | 1845.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-12-05 | Open Hole/Barefoot Completion | 3544.60 | 3552.00 | 0 |
2009-12-05 | Slotted Liner | 2222.90 | 3544.60 | 0 |
2009-12-17 | Fracture | 3518.00 | 3552.00 | 0 |
2010-03-04 | Fracture | 3432.80 | 3518.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 79 | 0.0 | 0.0 | 0.0 |
For data sources see[6]