X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595191716000

Well Details

Well ID: 0595191716000
Loading map...
Location: 00/16-17-059-19W5/0
Location Alias: 00/16-17-59-19 W5M
Location Alias 2: 00/16-17-059-19 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 19
Section: 17
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOBS 16-17-59-19
Operator Name: Paramount Resources Ltd.
License Number: 0305101
License Date: 2004-03-02
License Status: Issued
Spud Date: 2004-03-19
Final Drill Date: 2004-03-29
Well Total Depth: 2454.00 m
Surface Hole Latitude: 54.107336
Surface Hole Longitude: -116.806145

For data sources see[1][2]

Well History

Date Event
2004-03-02 Obtained License
2004-03-19 Lost Circulation Occurred
2004-03-21 Surface Casing Operation Performed
2004-03-29 Finished Drilling
2004-03-29 Well Log Performed
2004-03-29 Well Mode changed to Drilled and Cased
2004-03-31 Production Casing Operation Performed
2004-03-31 Rig Released
2004-04-23 Well Log Performed
2004-04-25 Perforation Treatment Performed - Jet Perforation
2004-04-25 Well Log Performed
2004-04-27 Perforation Treatment Performed - Fractured
2004-05-25 Well Began Production
2004-05-25 Well Fluid changed to Gas
2004-05-25 Well Mode changed to Flowing
2004-11-01 Perforation Treatment Performed - Jet Perforation
2004-11-01 Well Log Performed
2004-11-03 Perforation Treatment Performed - Fractured
2004-11-24 Well Fluid changed to Gas
2004-11-24 Well Mode changed to Flowing
2010-10-25 Well Fluid changed to Gas
2010-10-25 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-04-25 Perforation 2393.00 2399.00 17
2004-04-27 Fracture 2393.00 2399.00 0
2004-11-01 Perforation 2369.00 2376.00 17
2004-11-03 Fracture 2369.00 2376.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 4854 0.0 0.0 0.0
2005 8574 0.0 0.0 0.0
2006 7646 0.0 0.0 0.0
2007 7751 0.0 0.0 0.0
2008 7211 0.0 0.0 0.0
2009 1926 0.0 0.0 0.0
2010 5328 0.0 0.0 0.0
2011 8231 0.0 0.0 0.0
2012 4535 0.0 0.0 0.0
2013 6816 0.0 0.0 0.0
2014 8087 0.0 0.0 0.0
2015 8639 0.0 0.0 0.0
2016 7295 0.0 0.0 0.0
2017 5136 0.0 0.0 0.0
2018 8279 0.0 0.0 0.0
2019 8687 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2004-03-19 Lost Circulation 23.00 23.00

For data sources see[6]

References