If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595191913000 | |
Location: 00/13-19-059-19W5/0 | |
Location Alias: 00/13-19-59-19 W5M | |
Location Alias 2: 00/13-19-059-19 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 19 | |
Section: 19 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TRILOGY HZ KAYBOBS 13-19-59-19 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0436070 | |
License Date: 2011-08-16 | |
License Status: Issued | |
Spud Date: 2011-09-14 | |
Final Drill Date: 2011-10-08 | |
Well Total Depth: 4057.00 m | |
Surface Hole Latitude: 54.120082 | |
Surface Hole Longitude: -116.824666 |
Date | Event |
---|---|
2011-08-16 | Obtained License |
2011-09-15 | Lost Circulation Occurred |
2011-09-18 | Surface Casing Operation Performed |
2011-09-27 | Well Log Performed |
2011-09-28 | Intermediate Casing Operation Performed |
2011-09-29 | Direction Drilling Operation Performed - Horizontal |
2011-10-08 | Finished Drilling |
2011-10-08 | Well Mode changed to Drilled and Cased |
2011-10-12 | Liner Casing Operation Performed |
2011-10-14 | Rig Released |
2011-10-19 | Well Log Performed |
2011-10-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-22 | Perforation Treatment Performed - Open-Hole Completion |
2011-10-28 | Well Began Production |
2011-10-28 | Well Fluid changed to Gas |
2011-10-28 | Well Mode changed to Flowing |
2012-02-26 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-29 | 2570.90 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-22 | Open Hole/Barefoot Completion | 4053.00 | 4057.00 | 0 |
2011-10-22 | Multi-Stage Fracture | 3475.10 | 3475.20 | 0 |
2011-10-22 | Multi-Stage Fracture | 3399.90 | 3400.00 | 0 |
2011-10-22 | Multi-Stage Fracture | 3336.30 | 3336.40 | 0 |
2011-10-22 | Multi-Stage Fracture | 3261.50 | 3261.60 | 0 |
2011-10-22 | Multi-Stage Fracture | 3186.00 | 3186.10 | 0 |
2011-10-22 | Multi-Stage Fracture | 3122.50 | 3122.60 | 0 |
2011-10-22 | Multi-Stage Fracture | 3047.20 | 3047.30 | 0 |
2011-10-22 | Multi-Stage Fracture | 2972.10 | 2972.20 | 0 |
2011-10-22 | Multi-Stage Fracture | 2895.90 | 2896.00 | 0 |
2011-10-22 | Multi-Stage Fracture | 2830.60 | 2830.70 | 0 |
2011-10-22 | Multi-Stage Fracture | 4032.20 | 4032.30 | 0 |
2011-10-22 | Multi-Stage Fracture | 2754.30 | 2754.40 | 0 |
2011-10-22 | Multi-Stage Fracture | 2687.30 | 2687.40 | 0 |
2011-10-22 | Multi-Stage Fracture | 2608.80 | 2608.90 | 0 |
2011-10-22 | Multi-Stage Fracture | 2541.90 | 2542.00 | 0 |
2011-10-22 | Multi-Stage Fracture | 3978.10 | 3978.20 | 0 |
2011-10-22 | Multi-Stage Fracture | 3903.30 | 3903.40 | 0 |
2011-10-22 | Multi-Stage Fracture | 3840.30 | 3840.40 | 0 |
2011-10-22 | Multi-Stage Fracture | 3759.60 | 3759.70 | 0 |
2011-10-22 | Multi-Stage Fracture | 3689.50 | 3689.60 | 0 |
2011-10-22 | Multi-Stage Fracture | 3625.70 | 3625.80 | 0 |
2011-10-22 | Multi-Stage Fracture | 3550.50 | 3550.60 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1560 | 0.0 | 0.0 | 0.0 |
2012 | 8472 | 0.0 | 0.0 | 0.0 |
2013 | 8688 | 0.0 | 0.0 | 0.0 |
2014 | 8375 | 0.0 | 0.0 | 0.0 |
2015 | 8495 | 0.0 | 0.0 | 0.0 |
2016 | 8711 | 0.0 | 0.0 | 0.0 |
2017 | 8423 | 0.0 | 0.0 | 0.0 |
2018 | 7847 | 0.0 | 0.0 | 0.0 |
2019 | 7679 | 0.0 | 0.0 | 0.0 |
2020 | 2160 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2011-09-15 | Lost Circulation | 20.00 | 143.00 |
2012-03-02 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]