X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595210513002

Well Details

Well ID: 0595210513002
Loading map...
Location: 00/13-05-059-21W5/2
Location Alias: 00/13-05-59-21 W5M
Location Alias 2: 00/13-05-059-21 W5/02
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 21
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: TALISMAN FIR 13-5-59-21
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0176423
License Date: 1995-02-24
License Status: Issued
Spud Date: 1995-06-11
Final Drill Date: 1995-06-29
Well Total Depth: 2770.00 m
Surface Hole Latitude: 54.076258
Surface Hole Longitude: -117.121184

For data sources see[1][2]

Well History

Date Event
1995-02-24 Obtained License
1995-06-11 Lost Circulation Occurred
1995-06-13 Lost Circulation Occurred
1995-06-14 Surface Casing Operation Performed
1995-06-29 Finished Drilling
1995-06-29 Well Mode changed to Drilled and Cased
1995-06-30 Well Log Performed
1995-07-02 Production Casing Operation Performed
1995-07-02 Rig Released
1995-08-07 Well Log Performed
1995-08-09 Well Log Performed
1995-08-10 Perforation Treatment Performed - Jet Perforation
1995-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-18 Plug Back Performed
2005-03-19 Perforation Treatment Performed - Jet Perforation
2005-03-19 Well Log Performed
2005-03-23 Perforation Treatment Performed - Fractured
2005-04-22 Well Began Production
2005-04-22 Well Fluid changed to Gas
2005-04-22 Well Mode changed to Flowing
2011-06-01 Well Fluid changed to Gas
2011-06-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-08-10 Perforation 2739.00 2744.00 13
1995-08-13 Acid Treatment 2739.00 2744.00 0
2005-03-18 Packing Device Capped w/Cement 2717.10 2726.10 0
2005-03-19 Perforation 2683.00 2687.00 17
2005-03-23 Fracture 2683.00 2687.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 6551 0.0 0.0 0.0
2006 8544 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 5880 0.0 0.0 0.0
2009 4519 0.0 0.0 0.0
2010 8183 0.0 0.0 0.0
2011 6436 0.0 0.0 0.0
2012 2215 0.0 0.0 0.0
2013 7889 0.0 0.0 0.0
2014 8317 0.0 0.0 0.0
2015 8309 0.0 0.0 0.0
2016 8533 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 5897 0.0 0.0 0.0
2019 1983 0.0 0.0 0.0
2020 2016 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1995-06-11 Lost Circulation 82.00 110.00
1995-06-13 Lost Circulation 510.00 515.00

For data sources see[6]

References