If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595211713002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/13-17-059-21W5/2 | |
Location Alias: 00/13-17-59-21 W5M | |
Location Alias 2: 00/13-17-059-21 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 21 | |
Section: 17 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: PARA KAYBOBS 13-17-59-21 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0216879 | |
License Date: 1998-08-07 | |
License Status: Issued | |
Spud Date: 1998-08-29 | |
Final Drill Date: 1998-09-10 | |
Well Total Depth: 2744.00 m | |
Surface Hole Latitude: 54.105188 | |
Surface Hole Longitude: -117.120220 |
Date | Event |
---|---|
1998-08-07 | Obtained License |
1998-08-31 | Surface Casing Operation Performed |
1998-09-10 | Finished Drilling |
1998-09-11 | Well Log Performed |
1998-09-12 | Well Log Performed |
1998-09-14 | Production Casing Operation Performed |
1998-09-14 | Rig Released |
1998-10-03 | Well Log Performed |
1998-10-07 | Perforation Treatment Performed - Jet Perforation |
1998-10-07 | Well Log Performed |
1998-10-07 | Well Mode changed to Drilled and Cased |
1998-10-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-10-10 | Perforation Treatment Performed - Fractured |
1998-10-25 | Perforation Treatment Performed - Jet Perforation |
1998-10-25 | Well Mode changed to Drilled and Cased |
1998-10-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-11-05 | Perforation Treatment Performed - Fractured |
1999-01-12 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-10-07 | Perforation | 2606.00 | 2610.00 | 18 |
1998-10-08 | Acid Treatment | 2606.00 | 2610.00 | 0 |
1998-10-10 | Fracture | 2606.00 | 2610.00 | 0 |
1998-10-25 | Perforation | 2711.00 | 2715.00 | 13 |
1998-10-26 | Acid Treatment | 2711.00 | 2715.00 | 0 |
1998-11-05 | Fracture | 2711.00 | 2715.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 1193 | 0.0 | 0.0 | 0.0 |
2001 | 979 | 0.0 | 0.0 | 0.0 |
For data sources see[5]