If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595212501002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/01-25-059-21W5/2 | |
Location Alias: 00/01-25-59-21 W5M | |
Location Alias 2: 00/01-25-059-21 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 21 | |
Section: 25 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ACL FIR 1-25-59-21 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0395345 | |
License Date: 2008-03-13 | |
License Status: Issued | |
Spud Date: 2008-06-29 | |
Final Drill Date: 2008-07-15 | |
Well Total Depth: 2579.00 m | |
Surface Hole Latitude: 54.126395 | |
Surface Hole Longitude: -117.004568 |
Date | Event |
---|---|
2008-03-13 | Obtained License |
2008-06-29 | Lost Circulation Occurred |
2008-07-01 | Lost Circulation Occurred |
2008-07-05 | Surface Casing Operation Performed |
2008-07-08 | Direction Drilling Operation Performed - Deviate |
2008-07-15 | Finished Drilling |
2008-07-15 | Well Log Performed |
2008-07-15 | Well Mode changed to Drilled and Cased |
2008-07-17 | Production Casing Operation Performed |
2008-07-18 | Rig Released |
2008-08-17 | Perforation Treatment Performed - Jet Perforation |
2008-08-17 | Well Log Performed |
2008-08-26 | Perforation Treatment Performed - Fractured |
2008-08-29 | Perforation Treatment Performed - Jet Perforation |
2008-08-29 | Well Log Performed |
2008-09-01 | Perforation Treatment Performed - Fractured |
2008-10-20 | Well Began Production |
2008-10-20 | Well Fluid changed to Gas |
2008-10-20 | Well Mode changed to Flowing |
2009-06-12 | Well Structure changed to Commingled |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2008-07-08 | 1717.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-08-17 | Perforation | 2541.50 | 2546.50 | 17 |
2008-08-26 | Fracture | 2541.50 | 2546.50 | 0 |
2008-08-29 | Perforation | 2489.00 | 2491.00 | 17 |
2008-08-29 | Perforation | 2485.00 | 2487.50 | 17 |
2008-08-29 | Perforation | 2477.50 | 2481.00 | 17 |
2008-09-01 | Fracture | 2477.50 | 2491.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 1687 | 0.0 | 0.0 | 0.0 |
2009 | 2701 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2008-06-29 | Lost Circulation | 43.00 | 43.00 |
2008-07-01 | Lost Circulation | 360.00 | 360.00 |
For data sources see[7]