X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605111410000

Well Details

Well ID: 0605111410000
Loading map...
Location: 00/10-14-060-11W5/0
Location Alias: 00/10-14-60-11 W5M
Location Alias 2: 00/10-14-060-11 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 11
Section: 14
County/Municipality: Woodlands County
Well Name: IONIC WHITECOURT 10-14-60-11
Operator Name: TAQA North Ltd.
License Number: 0033429
License Date: 1968-01-09
License Status: Issued
Spud Date: 1968-01-10
Final Drill Date: 1968-01-19
Well Total Depth: 1581.90 m
Surface Hole Latitude: 54.191051
Surface Hole Longitude: -115.534920

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-01-09 Obtained License
1968-01-19 Finished Drilling
1968-01-21 Drill Stem Test Performed
1968-01-22 Drill Stem Test Performed
1968-01-23 Drill Stem Test Performed
1968-01-24 Production Casing Operation Performed
1968-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-01-26 Perforation Treatment Performed - Jet Perforation
1968-01-31 Perforation Treatment Performed - Fractured
1968-03-01 Perforation Treatment Performed - Jet Perforation
1968-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-05-13 Well Mode changed to Drilled and Cased
1994-02-08 Perforation Treatment Performed - Cement Squeeze
1994-02-08 Plug Back Performed
1994-02-08 Well Mode changed to Abandoned Zone
1994-02-15 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-01-26 Perforation 1521.30 1523.40 7
1994-02-15 Perforation 1537.80 1538.60 17
1994-02-15 Perforation 1538.90 1540.10 17
1994-02-15 Perforation 1542.70 1542.80 17
1994-02-15 Perforation 1544.20 1545.10 17
1968-01-26 Perforation 1524.00 1524.90 7
1968-01-26 Acid Treatment 1521.30 1524.90 0
1968-01-31 Fracture 1521.30 1554.50 0
1968-03-01 Perforation 1547.80 1548.70 7
1968-03-01 Perforation 1549.60 1554.50 7
1968-03-12 Acid Treatment 1547.80 1554.50 0
1994-02-08 Cement Squeeze 1521.30 1524.90 0
1994-02-15 Perforation 1536.60 1537.00 17

For data sources see[4]



References