X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605150307003

Well Details

Well ID: 0605150307003
Loading map...
Location: 00/07-03-060-15W5/3
Location Alias: 00/07-03-60-15 W5M
Location Alias 2: 00/07-03-060-15 W5/03
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 15
Section: 03
County/Municipality: Woodlands County
Well Name: TIDEWATER WIND 7-3-60-15
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0012177
License Date: 1956-08-30
License Status: Suspension
Spud Date: 1956-09-17
Final Drill Date: 1956-12-21
Well Total Depth: 2651.80 m
Surface Hole Latitude: 54.157421
Surface Hole Longitude: -116.161823

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-08-30 Obtained License
1956-10-02 Drill Stem Test Performed
1956-10-14 Drill Stem Test Performed
1956-10-15 Drill Stem Test Performed
1956-10-16 Drill Stem Test Performed
1956-10-18 Drill Stem Test Performed
1956-11-02 Drill Stem Test Performed
1956-11-03 Drill Stem Test Performed
1956-11-05 Drill Stem Test Performed
1956-11-16 Drill Stem Test Performed
1956-11-17 Drill Stem Test Performed
1956-11-20 Liner Casing Operation Performed
1956-11-25 Perforation Treatment Performed - Cement Squeeze
1956-11-25 Perforation Treatment Performed - Jet Perforation
1956-11-26 Perforation Treatment Performed - Cement Squeeze
1956-11-26 Perforation Treatment Performed - Jet Perforation
1956-11-27 Perforation Treatment Performed - Cement Squeeze
1956-11-27 Perforation Treatment Performed - Selective Jet Perforations
1956-12-04 Perforation Treatment Performed - Cement Squeeze
1956-12-04 Perforation Treatment Performed - Jet Perforation
1956-12-19 Drill Stem Test Performed
1956-12-20 Drill Stem Test Performed
1956-12-21 Finished Drilling
1956-12-21 Well Mode changed to Drilled and Cased
1957-08-04 Perforation Treatment Performed - Jet Perforation
1957-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-05-23 Perforation Treatment Performed - Jet Perforation
1980-09-17 Well Log Performed
1982-12-06 Perforation Treatment Performed - Cement Plug
1983-01-06 Perforation Treatment Performed - Cement Squeeze
1983-01-11 Perforation Treatment Performed - Cement Plug
1983-01-11 Perforation Treatment Performed - Jet Perforation
1983-01-14 Perforation Treatment Performed - Fractured
1990-06-29 Well Log Performed
1990-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-07 Plug Back Performed
1996-03-10 Perforation Treatment Performed - Jet Perforation
1996-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-03-16 Perforation Treatment Performed - Jet Perforation
1996-03-16 Well Log Performed
1996-04-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-04-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-04-03 Plug Back Performed
1996-04-06 Perforation Treatment Performed - Cement Squeeze
1996-04-10 Perforation Treatment Performed - Jet Perforation
1996-04-10 Well Log Performed
1996-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-17 Well Began Production
1996-04-17 Well Fluid changed to Gas
1996-04-17 Well Mode changed to Flowing
2007-12-01 Well Fluid changed to Gas
2007-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-11-25 Perforation 1935.20 1935.50 13
1957-08-05 Acid Treatment 2589.60 2601.50 0
1958-10-27 Acid Treatment 2589.60 2601.50 0
1962-05-23 Perforation 2567.60 2589.60 7
1982-12-06 Cement Plug 2592.90 2594.00 0
1983-01-06 Cement Squeeze 2567.60 2592.90 0
1983-01-11 Cement Plug 2581.20 2592.90 0
1983-01-11 Perforation 2567.00 2573.50 13
1983-01-11 Perforation 2576.50 2580.00 13
1983-01-14 Fracture 2567.00 2580.00 0
1990-07-09 Acid Treatment 2567.00 2580.00 0
1956-11-25 Cement Squeeze 1935.20 1935.50 0
1996-03-07 Packing Device Capped w/Cement 2462.00 2470.00 0
1996-03-10 Perforation 1942.80 1949.50 20
1996-03-12 Acid Treatment 1942.80 1949.50 0
1996-03-16 Perforation 1915.00 1929.50 17
1996-04-02 Packing Device Capped w/Cement 1980.20 1988.20 0
1996-04-03 Packing Device Capped w/Cement 1933.00 1941.00 0
1996-04-06 Cement Squeeze 1915.00 1929.50 0
1996-04-10 Perforation 1915.00 1922.40 13
1996-04-11 Acid Treatment 1915.00 1922.40 0
1956-11-26 Perforation 1914.10 1920.80 0
1956-11-26 Cement Squeeze 1914.10 1920.80 0
1956-11-27 Selective Jet Perforations 1575.80 1575.80 0
1956-11-27 Cement Squeeze 1575.80 1575.80 0
1956-12-04 Perforation 1575.50 1575.80 0
1956-12-04 Cement Squeeze 1575.50 1575.80 0
1957-08-04 Perforation 2589.60 2601.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 5193 0.0 0.0 0.0
1997 647 0.0 0.0 0.0
2000 1 0.0 0.0 0.0
2002 1 0.0 0.0 0.0
2003 600 0.0 0.0 0.0

For data sources see[5]

References