X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605152814002

Well Details

Well ID: 0605152814002
Loading map...
Location: 00/14-28-060-15W5/2
Location Alias: 00/14-28-60-15 W5M
Location Alias 2: 00/14-28-060-15 W5/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 15
Section: 28
County/Municipality: Woodlands County
Well Name: SW RESOURCES ULC WIND 14-28-60-15
Operator Name: Outlier Resources Ltd.
License Number: 0044655
License Date: 1972-12-29
License Status: Suspension
Spud Date: 1973-01-05
Final Drill Date: 1973-01-23
Well Total Depth: 2678.00 m
Surface Hole Latitude: 54.222036
Surface Hole Longitude: -116.193172

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-12-29 Obtained License
1973-01-23 Finished Drilling
1973-01-23 Well Mode changed to Drilled and Cased
1973-01-24 Lost Circulation Occurred
1973-01-26 Production Casing Operation Performed
1973-02-06 Perforation Treatment Performed - Jet Perforation
1973-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-02-12 Well Log Performed
1973-02-15 Perforation Treatment Performed - Cement Squeeze
1973-02-17 Perforation Treatment Performed - Abrasa-Jet Perforation
1973-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-02-17 Perforation Treatment Performed - Fractured
1973-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-03-02 Perforation Treatment Performed - Cement Squeeze
1973-03-03 Perforation Treatment Performed - Cement Squeeze
1973-03-05 Perforation Treatment Performed - Jet Perforation
1973-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-02-19 Perforation Treatment Performed - Jet Perforation
1976-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-23 Perforation Treatment Performed - Cement Squeeze
1976-02-24 Perforation Treatment Performed - Jet Perforation
1976-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-27 Perforation Treatment Performed - Cement Squeeze
1980-11-21 Perforation Treatment Performed - Jet Perforation
1980-11-21 Well Log Performed
1980-11-26 Perforation Treatment Performed - Fractured
1982-06-24 Well Began Production
1982-06-24 Well Fluid changed to Gas
1982-06-24 Well Mode changed to Flowing
1990-10-29 Well Log Performed
1998-11-04 Perforation Treatment Performed - Jet Perforation
1998-11-04 Well Log Performed
1998-11-07 Perforation Treatment Performed - Fractured
2001-01-01 Well Fluid changed to Gas
2001-01-01 Well Mode changed to Pumping
2008-01-26 Perforation Treatment Performed - Jet Perforation
2008-02-04 Well Log Performed
2008-02-05 Perforation Treatment Performed - Remedial Casing
2015-07-01 Well Fluid changed to Gas
2015-07-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-02-06 Perforation 2616.10 2619.10 7
1973-02-27 Acid Treatment 2615.20 2619.50 0
1973-03-02 Cement Squeeze 2615.20 2619.50 0
1973-03-03 Cement Squeeze 2615.20 2619.50 0
1973-03-05 Perforation 2622.20 2623.40 7
1973-03-05 Perforation 2625.50 2627.10 7
1973-03-06 Acid Treatment 2622.20 2627.10 0
1976-02-19 Packing Device Capped w/Cement 2599.90 2609.10 0
1976-02-19 Perforation 1820.30 1823.30 7
1976-02-20 Acid Treatment 1820.30 1823.30 0
1976-02-22 Acid Treatment 1820.30 1823.30 0
1973-02-07 Acid Treatment 2616.10 2619.10 0
1976-02-23 Cement Squeeze 1820.30 1823.30 0
1976-02-24 Perforation 1805.00 1806.90 7
1976-02-25 Acid Treatment 1805.00 1806.90 0
1976-02-27 Cement Squeeze 1805.00 1806.90 0
1980-11-21 Perforation 1699.20 1706.90 7
1980-11-26 Fracture 1699.20 1706.90 0
1998-11-04 Perforation 1479.50 1483.50 20
1998-11-07 Fracture 1479.50 1483.50 0
2008-01-26 Perforation 1250.00 1251.00 6
2008-02-05 Remedial Casing Cementing 1250.00 1251.00 0
1973-02-09 Acid Treatment 2616.10 2619.10 0
1973-02-15 Cement Squeeze 2616.10 2619.10 0
1973-02-17 Hydra Jet Perforation 2615.20 2619.50 0
1973-02-17 Fracture 2615.20 2619.50 0
1973-02-17 Acid Treatment 2615.20 2619.50 0
1973-02-21 Acid Treatment 2615.20 2619.50 0
1973-02-24 Acid Treatment 2615.20 2619.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 4531 0.0 0.0 0.0
1983 4579 0.0 0.0 0.0
1984 7468 0.0 0.0 0.0
1985 4228 0.0 0.0 0.0
1986 4773 0.0 0.0 0.0
1987 3498 0.0 0.0 0.0
1988 3813 0.0 0.0 0.0
1989 7380 0.0 0.0 0.0
1990 4023 0.0 0.0 0.0
1991 5023 0.0 0.0 0.0
1993 7005 0.0 0.0 0.0
1994 8206 0.0 0.0 0.0
1995 4558 0.0 0.0 0.0
1996 6803 0.0 0.0 0.0
1997 7365 0.0 0.0 0.0
1998 3237 0.0 0.0 0.0
1999 6266 0.0 0.0 0.0
2000 6664 0.0 0.0 0.0
2001 7985 0.0 0.0 0.0
2002 8522 0.0 0.0 0.0
2003 8197 0.0 0.0 0.0
2004 8475 0.0 0.0 0.0
2005 3696 0.0 0.0 0.0
2006 8711 0.0 0.0 0.0
2007 8660 0.0 0.0 0.0
2008 8213 0.0 0.0 0.0
2009 8552 0.0 0.0 0.0
2010 8082 0.0 0.0 0.0
2011 8325 0.0 0.0 0.0
2012 8442 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 4077 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1973-01-24 Lost Circulation 2678.00 2678.00

For data sources see[6]

References