X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605182816000

Well Details

Well ID: 0605182816000
Loading map...
Location: 00/16-28-060-18W5/0
Location Alias: 00/16-28-60-18 W5M
Location Alias 2: 00/16-28-060-18 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 18
Section: 28
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ KAYBOBS 16-28-60-18
Operator Name: XTO Energy Canada ULC
License Number: 0410755
License Date: 2009-06-02
License Status: Issued
Spud Date: 2009-07-06
Final Drill Date: 2009-07-26
Well Total Depth: 4300.00 m
Surface Hole Latitude: 54.202432
Surface Hole Longitude: -116.633325

For data sources see[1][2]

Well History

Date Event
2009-06-02 Obtained License
2009-07-08 Surface Casing Operation Performed
2009-07-10 Direction Drilling Operation Performed - Horizontal
2009-07-16 Production Casing Operation Performed
2009-07-26 Finished Drilling
2009-07-26 Well Mode changed to Drilled and Cased
2009-07-27 Well Log Performed
2009-07-29 Liner Casing Operation Performed
2009-07-29 Perforation Treatment Performed - Open-Hole Completion
2009-07-30 Rig Released
2009-08-05 Well Log Performed
2009-08-07 Perforation Treatment Performed - Multi-Stage Fracture
2009-08-07 Well Began Production
2009-08-07 Well Fluid changed to Gas
2009-08-07 Well Mode changed to Flowing
2009-08-11 Perforation Treatment Performed - Multi-Stage Fracture
2009-08-15 Well Log Performed
2015-10-01 Well Fluid changed to Gas
2015-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-07-10 1872.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-07-29 Open Hole/Barefoot Completion 4290.00 4300.00 0
2009-08-11 Multi-Stage Fracture 3275.30 3276.10 0
2009-08-11 Multi-Stage Fracture 3131.80 3132.60 0
2009-08-11 Multi-Stage Fracture 3001.60 3002.40 0
2009-08-11 Multi-Stage Fracture 2871.20 2872.00 0
2009-08-11 Multi-Stage Fracture 2740.90 2741.80 0
2009-08-11 Multi-Stage Fracture 2610.70 2611.50 0
2009-08-11 Multi-Stage Fracture 2480.50 2481.30 0
2009-08-11 Multi-Stage Fracture 2403.60 2404.40 0
2009-08-07 Multi-Stage Fracture 4280.10 4281.40 0
2009-08-07 Multi-Stage Fracture 4199.20 4200.00 0
2009-08-07 Multi-Stage Fracture 4056.60 4057.40 0
2009-08-07 Multi-Stage Fracture 3926.30 3927.10 0
2009-08-07 Multi-Stage Fracture 3796.10 3796.90 0
2009-08-07 Multi-Stage Fracture 3665.90 3666.70 0
2009-08-07 Multi-Stage Fracture 3535.80 3536.60 0
2009-08-07 Multi-Stage Fracture 3405.50 3406.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 3107 0.0 0.0 0.0
2010 8656 0.0 0.0 0.0
2011 8697 0.0 0.0 0.0
2012 6483 0.0 0.0 0.0
2013 6816 0.0 0.0 0.0
2014 6617 0.0 0.0 0.0
2015 7901 0.0 0.0 0.0
2016 7392 0.0 0.0 0.0
2017 7243 0.0 0.0 0.0
2018 5825 0.0 0.0 0.0
2019 7161 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-08-11 No Incident Encountered 0.00 0.00

For data sources see[7]

References