X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605190803000

Well Details

Well ID: 0605190803000
Loading map...
Location: 00/03-08-060-19W5/0
Location Alias: 00/03-08-60-19 W5M
Location Alias 2: 00/03-08-060-19 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 19
Section: 08
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ KAYBOBS 3-8-60-19
Operator Name: XTO Energy Canada ULC
License Number: 0415719
License Date: 2009-12-16
License Status: Issued
Spud Date: 2010-01-16
Final Drill Date: 2010-02-02
Well Total Depth: 3848.00 m
Surface Hole Latitude: 54.184784
Surface Hole Longitude: -116.819773

For data sources see[1][2]

Well History

Date Event
2009-12-16 Obtained License
2010-01-18 Surface Casing Operation Performed
2010-01-21 Direction Drilling Operation Performed - Horizontal
2010-01-27 Production Casing Operation Performed
2010-02-02 Finished Drilling
2010-02-02 Well Log Performed
2010-02-02 Well Mode changed to Drilled and Cased
2010-02-03 Well Log Performed
2010-02-04 Liner Casing Operation Performed
2010-02-04 Perforation Treatment Performed - Open-Hole Completion
2010-02-05 Rig Released
2010-02-12 Well Log Performed
2010-02-25 Well Began Production
2010-02-25 Well Fluid changed to Gas
2010-02-25 Well Mode changed to Flowing
2010-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-05 Well Fluid changed to Gas
2011-04-05 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-01-21 1818.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-04 Open Hole/Barefoot Completion 3834.00 3848.00 0
2010-02-26 Multi-Stage Fracture 2930.00 2930.10 0
2010-02-26 Multi-Stage Fracture 2819.60 2819.70 0
2010-02-26 Multi-Stage Fracture 2697.50 2697.60 0
2010-02-26 Multi-Stage Fracture 2586.30 2586.40 0
2010-02-26 Multi-Stage Fracture 2509.90 2510.00 0
2010-02-26 Multi-Stage Fracture 3830.10 3830.20 0
2010-02-26 Multi-Stage Fracture 3753.40 3753.50 0
2010-02-26 Multi-Stage Fracture 3631.10 3631.20 0
2010-02-26 Multi-Stage Fracture 3519.60 3519.70 0
2010-02-26 Multi-Stage Fracture 3404.90 3405.00 0
2010-02-26 Multi-Stage Fracture 3281.80 3281.90 0
2010-02-26 Multi-Stage Fracture 3160.40 3160.50 0
2010-02-26 Multi-Stage Fracture 3051.30 3051.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 7023 0.0 0.0 0.0
2011 7882 0.0 0.0 0.0
2012 6807 0.0 0.0 0.0
2013 5164 0.0 0.0 0.0
2014 2851 0.0 0.0 0.0
2015 4147 0.0 0.0 0.0
2016 5729 0.0 0.0 0.0
2017 3255 0.0 0.0 0.0
2018 4183 0.0 0.0 0.0
2019 4447 0.0 0.0 0.0
2020 1005 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-02-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References