X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605191608000

Well Details

Well ID: 0605191608000
Loading map...
Location: 00/08-16-060-19W5/0
Location Alias: 00/08-16-60-19 W5M
Location Alias 2: 00/08-16-060-19 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 19
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ KAYBOBS 8-16-60-19
Operator Name: XTO Energy Canada ULC
License Number: 0409873
License Date: 2009-03-25
License Status: Issued
Spud Date: 2009-04-05
Final Drill Date: 2009-04-29
Well Total Depth: 4159.00 m
Surface Hole Latitude: 54.198102
Surface Hole Longitude: -116.802697

For data sources see[1][2]

Well History

Date Event
2009-03-25 Obtained License
2009-04-07 Surface Casing Operation Performed
2009-04-11 Direction Drilling Operation Performed - Horizontal
2009-04-21 Production Casing Operation Performed
2009-04-21 Well Log Performed
2009-04-29 Finished Drilling
2009-04-29 Well Log Performed
2009-04-29 Well Mode changed to Drilled and Cased
2009-05-02 Liner Casing Operation Performed
2009-05-02 Perforation Treatment Performed - Open-Hole Completion
2009-05-03 Rig Released
2009-06-01 Well Log Performed
2009-08-06 Perforation Treatment Performed - Multi-Stage Fracture
2009-08-07 Well Began Production
2009-08-07 Well Fluid changed to Gas
2009-08-07 Well Mode changed to Flowing
2009-08-20 Well Log Performed
2014-06-16 Well Fluid changed to Gas
2014-06-16 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-04-11 1789.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-05-02 Open Hole/Barefoot Completion 4148.00 4159.00 0
2009-08-06 Multi-Stage Fracture 2857.00 2857.80 0
2009-08-06 Multi-Stage Fracture 2666.80 2667.60 0
2009-08-06 Multi-Stage Fracture 2566.30 2567.10 0
2009-08-06 Multi-Stage Fracture 4138.10 4139.40 0
2009-08-06 Multi-Stage Fracture 4058.50 4059.70 0
2009-08-06 Multi-Stage Fracture 3906.40 3907.20 0
2009-08-06 Multi-Stage Fracture 3726.90 3727.70 0
2009-08-06 Multi-Stage Fracture 3534.70 3535.50 0
2009-08-06 Multi-Stage Fracture 3381.20 3382.00 0
2009-08-06 Multi-Stage Fracture 3202.00 3202.80 0
2009-08-06 Multi-Stage Fracture 3022.70 3023.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 1919 0.0 0.0 0.0
2010 8458 0.0 0.0 0.0
2011 8565 0.0 0.0 0.0
2012 8484 0.0 0.0 0.0
2013 7991 0.0 0.0 0.0
2014 8407 0.0 0.0 0.0
2015 8025 0.0 0.0 0.0
2016 6493 0.0 0.0 0.0
2017 7225 0.0 0.0 0.0
2018 5201 0.0 0.0 0.0
2019 5456 0.0 0.0 0.0
2020 1922 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-08-06 No Incident Encountered 0.00 0.00

For data sources see[7]

References