X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605192101020

Well Details

Well ID: 0605192101020
Loading map...
Location: 02/01-21-060-19W5/0
Location Alias: 02/01-21-60-19 W5M
Location Alias 2: 02/01-21-060-19 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 19
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC 102 HZ KAYBOBS 1-21-60-19
Operator Name: XTO Energy Canada ULC
License Number: 0414135
License Date: 2009-11-18
License Status: Amended
Spud Date: 2010-07-30
Final Drill Date: 2010-08-17
Well Total Depth: 3760.00 m
Surface Hole Latitude: 54.209291
Surface Hole Longitude: -116.781074

For data sources see[1][2]

Well History

Date Event
2009-11-18 Obtained License
2010-08-01 Surface Casing Operation Performed
2010-08-04 Direction Drilling Operation Performed - Horizontal
2010-08-04 Well Log Performed
2010-08-12 Production Casing Operation Performed
2010-08-17 Finished Drilling
2010-08-17 Well Mode changed to Drilled and Cased
2010-08-20 Liner Casing Operation Performed
2010-08-20 Perforation Treatment Performed - Open-Hole Completion
2010-08-21 Rig Released
2010-08-23 Well Log Performed
2010-08-31 Perforation Treatment Performed - Multi-Stage Fracture
2010-08-31 Well Fluid changed to Gas
2010-08-31 Well Mode changed to Testing
2010-09-01 Well Began Production
2010-09-01 Well Fluid changed to Gas
2010-09-01 Well Mode changed to Flowing
2012-08-01 Well Fluid changed to Gas
2012-08-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-08-04 1825.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-20 Open Hole/Barefoot Completion 3752.20 3760.00 0
2010-08-31 Multi-Stage Fracture 2777.00 2778.60 0
2010-08-31 Multi-Stage Fracture 2649.40 2651.00 0
2010-08-31 Multi-Stage Fracture 2522.40 2524.00 0
2010-08-31 Multi-Stage Fracture 2449.30 2450.90 0
2010-08-31 Multi-Stage Fracture 3742.30 3743.70 0
2010-08-31 Multi-Stage Fracture 3652.90 3654.50 0
2010-08-31 Multi-Stage Fracture 3525.10 3526.70 0
2010-08-31 Multi-Stage Fracture 3397.60 3399.20 0
2010-08-31 Multi-Stage Fracture 3283.50 3285.10 0
2010-08-31 Multi-Stage Fracture 3157.60 3159.20 0
2010-08-31 Multi-Stage Fracture 3030.50 3032.10 0
2010-08-31 Multi-Stage Fracture 2903.70 2905.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2771 0.0 0.0 0.0
2011 8267 0.0 0.0 0.0
2012 4885 0.0 0.0 0.0
2013 6363 0.0 0.0 0.0
2014 7956 0.0 0.0 0.0
2015 5916 0.0 0.0 0.0
2016 5367 0.0 0.0 0.0
2017 6246 0.0 0.0 0.0
2018 3624 0.0 0.0 0.0
2019 2049 0.0 0.0 0.0
2020 1478 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-08-31 No Incident Encountered 0.00 0.00

For data sources see[7]

References