X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605192115020

Well Details

Well ID: 0605192115020
Loading map...
Location: 02/15-21-060-19W5/0
Location Alias: 02/15-21-60-19 W5M
Location Alias 2: 02/15-21-060-19 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 19
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC 102 HZ KAYBOBS 15-21-60-19
Operator Name: XTO Energy Canada ULC
License Number: 0410128
License Date: 2009-04-16
License Status: Issued
Spud Date: 2009-05-04
Final Drill Date: 2009-05-28
Well Total Depth: 3794.00 m
Surface Hole Latitude: 54.198205
Surface Hole Longitude: -116.802847

For data sources see[1][2]

Well History

Date Event
2009-04-16 Obtained License
2009-05-04 Well Log Performed
2009-05-05 Surface Casing Operation Performed
2009-05-09 Direction Drilling Operation Performed - Horizontal
2009-05-15 Direction Drilling Operation Performed - Sidetrack Fish
2009-05-21 Production Casing Operation Performed
2009-05-28 Finished Drilling
2009-05-28 Well Log Performed
2009-05-28 Well Mode changed to Drilled and Cased
2009-05-29 Well Log Performed
2009-05-31 Liner Casing Operation Performed
2009-05-31 Perforation Treatment Performed - Open-Hole Completion
2009-06-01 Rig Released
2009-08-05 Perforation Treatment Performed - Multi-Stage Fracture
2009-08-05 Well Began Production
2009-08-05 Well Fluid changed to Gas
2009-08-05 Well Mode changed to Flowing
2009-08-30 Well Log Performed
2018-04-18 Well Fluid changed to Gas
2018-04-18 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-05-09 2107.00 Horizontal
2009-05-15 2113.80 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-05-31 Open Hole/Barefoot Completion 3779.00 3794.00 0
2009-08-05 Multi-Stage Fracture 2623.50 2624.30 0
2009-08-05 Multi-Stage Fracture 2478.80 2479.60 0
2009-08-05 Multi-Stage Fracture 2375.90 2376.70 0
2009-08-05 Multi-Stage Fracture 3769.00 3770.30 0
2009-08-05 Multi-Stage Fracture 3688.20 3689.00 0
2009-08-05 Multi-Stage Fracture 3520.40 3521.20 0
2009-08-05 Multi-Stage Fracture 3381.20 3382.00 0
2009-08-05 Multi-Stage Fracture 3228.00 3228.80 0
2009-08-05 Multi-Stage Fracture 3074.70 3075.50 0
2009-08-05 Multi-Stage Fracture 2921.70 2922.50 0
2009-08-05 Multi-Stage Fracture 2794.70 2795.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 1963 0.0 0.0 0.0
2010 8460 0.0 0.0 0.0
2011 8443 0.0 0.0 0.0
2012 8422 0.0 0.0 0.0
2013 7988 0.0 0.0 0.0
2014 8433 0.0 0.0 0.0
2015 8043 0.0 0.0 0.0
2016 4658 0.0 0.0 0.0
2017 7219 0.0 0.0 0.0
2018 5021 0.0 0.0 0.0
2019 5482 0.0 0.0 0.0
2020 2102 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-08-05 No Incident Encountered 0.00 0.00

For data sources see[7]

References