X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605192401002

Well Details

Well ID: 0605192401002
Loading map...
Location: 00/01-24-060-19W5/2
Location Alias: 00/01-24-60-19 W5M
Location Alias 2: 00/01-24-060-19 W5/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 19
Section: 24
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC ETAL RE-EN KAYBOBS 1-24-60-19
Operator Name: XTO Energy Canada ULC
License Number: 0411621
License Date: 2009-07-29
License Status: Amended
Spud Date: 2011-08-08
Final Drill Date: 2011-08-18
Well Total Depth: 4120.00 m
Surface Hole Latitude: 54.211931
Surface Hole Longitude: -116.719901

For data sources see[1][2]

Well History

Date Event
2009-07-29 Obtained License
2011-08-07 Well Log Performed
2011-08-08 Direction Drilling Operation Performed - Horizontal
2011-08-18 Finished Drilling
2011-08-18 Well Log Performed
2011-08-18 Well Mode changed to Drilled and Cased
2011-08-20 Liner Casing Operation Performed
2011-08-22 Rig Released
2011-08-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-26 Perforation Treatment Performed - Open-Hole Completion
2011-08-27 Well Began Production
2011-08-27 Well Fluid changed to Gas
2011-08-27 Well Mode changed to Flowing
2012-01-01 Well Fluid changed to Gas
2012-01-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-08 1470.00 Horizontal
2011-08-08 2308.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-26 Open Hole/Barefoot Completion 4111.00 4120.00 0
2011-08-26 Multi-Stage Fracture 3375.10 3376.80 0
2011-08-26 Multi-Stage Fracture 3275.40 3277.10 0
2011-08-26 Multi-Stage Fracture 3179.70 3181.40 0
2011-08-26 Multi-Stage Fracture 3084.70 3086.40 0
2011-08-26 Multi-Stage Fracture 2980.00 2981.70 0
2011-08-26 Multi-Stage Fracture 2897.70 2899.40 0
2011-08-26 Multi-Stage Fracture 2829.10 2830.80 0
2011-08-26 Multi-Stage Fracture 4106.00 4107.00 0
2011-08-26 Multi-Stage Fracture 4036.30 4038.00 0
2011-08-26 Multi-Stage Fracture 3945.50 3947.20 0
2011-08-26 Multi-Stage Fracture 3847.60 3849.30 0
2011-08-26 Multi-Stage Fracture 3744.50 3746.20 0
2011-08-26 Multi-Stage Fracture 3662.40 3664.10 0
2011-08-26 Multi-Stage Fracture 3555.10 3556.80 0
2011-08-26 Multi-Stage Fracture 3468.20 3469.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2775 0.0 0.0 0.0
2012 7861 0.0 0.0 0.0
2013 7889 0.0 0.0 0.0
2014 3142 0.0 0.0 0.0
2015 5692 0.0 0.0 0.0
2016 4562 0.0 0.0 0.0
2017 6740 0.0 0.0 0.0
2018 4349 0.0 0.0 0.0
2019 287 0.0 0.0 0.0
2020 442 0.0 0.0 0.0

For data sources see[6]

References