X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605192816002

Well Details

Well ID: 0605192816002
Loading map...
Location: 00/16-28-060-19W5/2
Location Alias: 00/16-28-60-19 W5M
Location Alias 2: 00/16-28-060-19 W5/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 19
Section: 28
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ KAYBOBS 16-28-60-19
Operator Name: XTO Energy Canada ULC
License Number: 0412946
License Date: 2009-10-07
License Status: Amended
Spud Date: 2009-10-11
Final Drill Date: 2009-12-09
Well Total Depth: 4064.00 m
Surface Hole Latitude: 54.226152
Surface Hole Longitude: -116.810879

For data sources see[1][2]

Well History

Date Event
2009-10-07 Obtained License
2009-10-12 Surface Casing Operation Performed
2009-11-08 Direction Drilling Operation Performed - Horizontal
2009-11-27 Production Casing Operation Performed
2009-11-29 Direction Drilling Operation Performed - Horizontal
2009-12-09 Finished Drilling
2009-12-09 Well Log Performed
2009-12-09 Well Mode changed to Drilled and Cased
2009-12-10 Well Log Performed
2009-12-12 Liner Casing Operation Performed
2009-12-12 Perforation Treatment Performed - Open-Hole Completion
2009-12-12 Rig Released
2009-12-19 Well Log Performed
2009-12-28 Perforation Treatment Performed - Multi-Stage Fracture
2009-12-30 Well Began Production
2009-12-30 Well Fluid changed to Gas
2009-12-30 Well Mode changed to Flowing
2010-01-08 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-01 Well Fluid changed to Gas
2015-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-11-08 1770.00 Horizontal
2009-11-29 2413.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-12-12 Open Hole/Barefoot Completion 4060.00 4064.00 0
2010-01-08 Multi-Stage Fracture 3224.10 3224.90 0
2010-01-08 Multi-Stage Fracture 3112.90 3113.70 0
2010-01-08 Multi-Stage Fracture 3018.50 3019.30 0
2010-01-08 Multi-Stage Fracture 2922.10 2922.90 0
2010-01-08 Multi-Stage Fracture 2863.70 2864.50 0
2009-12-28 Multi-Stage Fracture 4050.50 4051.80 0
2009-12-28 Multi-Stage Fracture 3788.20 3789.00 0
2009-12-28 Multi-Stage Fracture 3895.70 3896.50 0
2010-01-08 Multi-Stage Fracture 3693.50 3694.30 0
2010-01-08 Multi-Stage Fracture 3598.20 3599.00 0
2010-01-08 Multi-Stage Fracture 3500.40 3501.20 0
2010-01-08 Multi-Stage Fracture 3416.30 3417.10 0
2010-01-08 Multi-Stage Fracture 3309.00 3310.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 9 0.0 0.0 0.0
2010 8093 0.0 0.0 0.0
2011 5216 0.0 0.0 0.0
2012 4124 0.0 0.0 0.0
2013 6808 0.0 0.0 0.0
2014 6692 0.0 0.0 0.0
2015 2617 0.0 0.0 0.0
2016 1222 0.0 0.0 0.0
2017 5305 0.0 0.0 0.0
2018 5015 0.0 0.0 0.0
2019 2760 0.0 0.0 0.0
2020 2173 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-01-08 No Incident Encountered 0.00 0.00
2013-09-30 No Incident Encountered 0.00 0.00

For data sources see[7]

References