X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605200610000

Well Details

Well ID: 0605200610000
Loading map...
Location: 00/10-06-060-20W5/0
Location Alias: 00/10-06-60-20 W5M
Location Alias 2: 00/10-06-060-20 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 06
County/Municipality: Municipal District of Greenview No. 16
Well Name: DAYLIGHT KAYBOBS 10-6-60-20
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0080399
License Date: 1980-01-14
License Status: Suspension
Spud Date: 1980-01-24
Final Drill Date: 1980-03-08
Well Total Depth: 2602.00 m
Surface Hole Latitude: 54.162465
Surface Hole Longitude: -116.985695

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-01-14 Obtained License
1980-01-25 Lost Circulation Occurred
1980-03-08 Finished Drilling
1980-03-08 Well Log Performed
1980-03-11 Drill Stem Test Performed
1980-03-12 Drill Stem Test Performed
1980-03-15 Production Casing Operation Performed
1980-03-28 Perforation Treatment Performed - Jet Perforation
1980-03-31 Perforation Treatment Performed - Fractured
1980-05-18 Perforation Treatment Performed - Jet Perforation
1980-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-22 Perforation Treatment Performed - Cement Squeeze
1980-05-23 Perforation Treatment Performed - Jet Perforation
1980-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-31 Perforation Treatment Performed - Cement Squeeze
1980-06-07 Well Mode changed to Drilled and Cased
2004-12-19 Well Began Production
2004-12-19 Well Fluid changed to Gas
2004-12-19 Well Mode changed to Flowing
2014-12-01 Well Fluid changed to Gas
2014-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-03-28 Perforation 2376.50 2378.50 13
1980-03-28 Perforation 2381.00 2382.00 13
1980-03-31 Fracture 2376.50 2382.00 0
1980-05-18 Perforation 1856.00 1865.00 13
1980-05-19 Acid Treatment 1856.00 1865.00 0
1980-05-22 Cement Squeeze 1856.00 1865.00 0
1980-05-23 Perforation 1645.00 1647.00 13
1980-05-26 Acid Treatment 1645.00 1647.00 0
1980-05-31 Cement Squeeze 1645.00 1647.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 305 0.0 0.0 0.0
2005 7808 0.0 0.0 0.0
2006 4197 0.0 0.0 0.0
2007 6736 0.0 0.0 0.0
2008 8327 0.0 0.0 0.0
2009 8615 0.0 0.0 0.0
2010 8556 0.0 0.0 0.0
2011 8511 0.0 0.0 0.0
2012 7458 0.0 0.0 0.0
2013 6503 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-01-25 Lost Circulation 30.00 155.00

For data sources see[6]

References