X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605200904000

Well Details

Well ID: 0605200904000
Loading map...
Location: 00/04-09-060-20W5/0
Location Alias: 00/04-09-60-20 W5M
Location Alias 2: 00/04-09-060-20 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 09
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ KAYBOBS 4-9-60-20
Operator Name: XTO Energy Canada ULC
License Number: 0414953
License Date: 2009-12-01
License Status: Issued
Spud Date: 2009-12-19
Final Drill Date: 2010-01-14
Well Total Depth: 3912.00 m
Surface Hole Latitude: 54.171078
Surface Hole Longitude: -116.919864

For data sources see[1][2]

Well History

Date Event
2009-12-01 Obtained License
2009-12-21 Surface Casing Operation Performed
2009-12-30 Direction Drilling Operation Performed - Horizontal
2010-01-05 Production Casing Operation Performed
2010-01-14 Finished Drilling
2010-01-14 Well Log Performed
2010-01-14 Well Mode changed to Drilled and Cased
2010-01-16 Liner Casing Operation Performed
2010-01-16 Perforation Treatment Performed - Open-Hole Completion
2010-01-16 Rig Released
2010-01-21 Well Log Performed
2010-01-29 Perforation Treatment Performed - Multi-Stage Fracture
2010-01-30 Well Fluid changed to Gas
2010-01-30 Well Mode changed to Testing
2010-02-09 Well Began Production
2010-02-09 Well Fluid changed to Gas
2010-02-09 Well Mode changed to Flowing
2011-01-01 Well Fluid changed to Gas
2011-01-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-12-30 1864.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-01-16 Open Hole/Barefoot Completion 3902.80 3912.00 0
2010-01-29 Multi-Stage Fracture 3218.10 3218.60 0
2010-01-29 Multi-Stage Fracture 3147.80 3148.30 0
2010-01-29 Multi-Stage Fracture 3050.30 3050.80 0
2010-01-29 Multi-Stage Fracture 2979.20 2979.70 0
2010-01-29 Multi-Stage Fracture 2883.60 2884.10 0
2010-01-29 Multi-Stage Fracture 2800.60 2801.10 0
2010-01-29 Multi-Stage Fracture 2716.70 2717.20 0
2010-01-29 Multi-Stage Fracture 2660.00 2660.50 0
2010-01-29 Multi-Stage Fracture 3897.90 3898.80 0
2010-01-29 Multi-Stage Fracture 3839.20 3839.70 0
2010-01-29 Multi-Stage Fracture 3742.30 3742.80 0
2010-01-29 Multi-Stage Fracture 3645.90 3646.40 0
2010-01-29 Multi-Stage Fracture 3562.30 3562.80 0
2010-01-29 Multi-Stage Fracture 3482.50 3483.00 0
2010-01-29 Multi-Stage Fracture 3398.40 3398.90 0
2010-01-29 Multi-Stage Fracture 3315.60 3316.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 7189 0.0 0.0 0.0
2011 8230 0.0 0.0 0.0
2012 3280 0.0 0.0 0.0
2013 6903 0.0 0.0 0.0
2014 5915 0.0 0.0 0.0
2015 6063 0.0 0.0 0.0
2016 6325 0.0 0.0 0.0
2017 6804 0.0 0.0 0.0
2018 4990 0.0 0.0 0.0
2019 4826 0.0 0.0 0.0
2020 1681 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-01-29 No Incident Encountered 0.00 0.00

For data sources see[7]

References