X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605200907000

Well Details

Well ID: 0605200907000
Loading map...
Location: 00/07-09-060-20W5/0
Location Alias: 00/07-09-60-20 W5M
Location Alias 2: 00/07-09-060-20 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 09
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ KAYBOBS 7-9-60-20
Operator Name: XTO Energy Canada ULC
License Number: 0431649
License Date: 2011-02-17
License Status: Amended
Spud Date: 2011-02-20
Final Drill Date: 2011-03-18
Well Total Depth: 5275.00 m
Surface Hole Latitude: 54.184040
Surface Hole Longitude: -116.903366

For data sources see[1][2]

Well History

Date Event
2011-02-17 Obtained License
2011-02-22 Surface Casing Operation Performed
2011-02-26 Direction Drilling Operation Performed - Horizontal
2011-03-05 Production Casing Operation Performed
2011-03-18 Finished Drilling
2011-03-18 Well Log Performed
2011-03-18 Well Mode changed to Drilled and Cased
2011-03-22 Liner Casing Operation Performed
2011-03-23 Rig Released
2011-03-26 Well Log Performed
2011-03-31 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-31 Perforation Treatment Performed - Open-Hole Completion
2011-04-01 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-02 Well Began Production
2011-04-02 Well Fluid changed to Gas
2011-04-02 Well Mode changed to Flowing
2012-08-01 Well Fluid changed to Gas
2012-08-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-02-26 1980.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-31 Open Hole/Barefoot Completion 5270.00 5275.00 0
2011-03-31 Multi-Stage Fracture 4242.80 4244.40 0
2011-03-31 Multi-Stage Fracture 4125.00 4126.60 0
2011-04-01 Multi-Stage Fracture 3959.00 3960.60 0
2011-04-01 Multi-Stage Fracture 3844.40 3846.00 0
2011-04-01 Multi-Stage Fracture 3715.90 3717.50 0
2011-04-01 Multi-Stage Fracture 3436.50 3438.10 0
2011-04-01 Multi-Stage Fracture 3313.70 3315.30 0
2011-04-01 Multi-Stage Fracture 3152.00 3153.60 0
2011-04-01 Multi-Stage Fracture 3037.60 3039.20 0
2011-04-01 Multi-Stage Fracture 2899.70 2901.30 0
2011-03-31 Multi-Stage Fracture 5258.70 5261.40 0
2011-04-01 Multi-Stage Fracture 2770.60 2772.20 0
2011-04-01 Multi-Stage Fracture 2639.10 2640.70 0
2011-04-01 Multi-Stage Fracture 2550.10 2551.70 0
2011-03-31 Multi-Stage Fracture 5158.80 5160.40 0
2011-03-31 Multi-Stage Fracture 5025.30 5026.90 0
2011-03-31 Multi-Stage Fracture 4919.10 4920.70 0
2011-03-31 Multi-Stage Fracture 4769.80 4771.40 0
2011-03-31 Multi-Stage Fracture 4640.10 4641.70 0
2011-03-31 Multi-Stage Fracture 4503.10 4504.70 0
2011-03-31 Multi-Stage Fracture 4364.80 4366.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6271 0.0 0.0 0.0
2012 7838 0.0 0.0 0.0
2013 7981 0.0 0.0 0.0
2014 8026 0.0 0.0 0.0
2015 8163 0.0 0.0 0.0
2016 6530 0.0 0.0 0.0
2017 6789 0.0 0.0 0.0
2018 5263 0.0 0.0 0.0
2019 5133 0.0 0.0 0.0
2020 1800 0.0 0.0 0.0

For data sources see[6]

References