X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605201001003

Well Details

Well ID: 0605201001003
Loading map...
Location: 00/01-10-060-20W5/3
Location Alias: 00/01-10-60-20 W5M
Location Alias 2: 00/01-10-060-20 W5/03
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ RE-EN KAYBOBS 1-10-60-20
Operator Name: XTO Energy Canada ULC
License Number: 0208715
License Date: 1997-11-18
License Status: Amended
Spud Date: 2009-01-13
Final Drill Date: 2009-01-24
Well Total Depth: 3349.20 m
Surface Hole Latitude: 54.170884
Surface Hole Longitude: -116.920053

For data sources see[1][2]

Well History

Date Event
1997-11-18 Obtained License
2004-03-17 Well Abandoned
2009-01-13 Direction Drilling Operation Performed - Horizontal
2009-01-24 Finished Drilling
2009-01-24 Well Log Performed
2009-01-24 Well Mode changed to Drilled and Cased
2009-01-27 Well Log Performed
2009-01-28 Liner Casing Operation Performed
2009-01-28 Perforation Treatment Performed - Open-Hole Completion
2009-01-29 Rig Released
2009-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2009-02-11 Well Began Production
2009-02-11 Well Fluid changed to Gas
2009-02-11 Well Mode changed to Flowing
2009-02-17 Well Log Performed
2009-12-16 Well Log Performed
2011-02-01 Well Fluid changed to Gas
2011-02-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-01-13 2281.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-01-28 Open Hole/Barefoot Completion 3329.60 3349.20 0
2009-02-09 Multi-Stage Fracture 3318.40 3319.60 0
2009-02-09 Multi-Stage Fracture 3235.50 3236.20 0
2009-02-09 Multi-Stage Fracture 3036.00 3036.70 0
2009-02-09 Multi-Stage Fracture 2876.90 2877.60 0
2009-02-09 Multi-Stage Fracture 2677.50 2678.20 0
2009-02-09 Multi-Stage Fracture 2529.20 2529.90 0
2009-02-09 Multi-Stage Fracture 2411.20 2411.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 6925 0.0 0.0 0.0
2010 8054 0.0 0.0 0.0
2011 8175 0.0 0.0 0.0
2012 7221 0.0 0.0 0.0
2013 6152 0.0 0.0 0.0
2014 4224 0.0 0.0 0.0
2015 4263 0.0 0.0 0.0
2016 5314 0.0 0.0 0.0
2017 6451 0.0 0.0 0.0
2018 4885 0.0 0.0 0.0
2019 4279 0.0 0.0 0.0
2020 1249 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-02-09 No Incident Encountered 0.00 0.00

For data sources see[7]

References