X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605201008000

Well Details

Well ID: 0605201008000
Loading map...
Location: 00/08-10-060-20W5/0
Location Alias: 00/08-10-60-20 W5M
Location Alias 2: 00/08-10-060-20 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ KAYBOBS 8-10-60-20
Operator Name: XTO Energy Canada ULC
License Number: 0417722
License Date: 2010-01-21
License Status: Issued
Spud Date: 2010-02-02
Final Drill Date: 2010-02-24
Well Total Depth: 3650.00 m
Surface Hole Latitude: 54.183919
Surface Hole Longitude: -116.902886

For data sources see[1][2]

Well History

Date Event
2010-01-21 Obtained License
2010-02-05 Surface Casing Operation Performed
2010-02-09 Direction Drilling Operation Performed - Horizontal
2010-02-17 Production Casing Operation Performed
2010-02-24 Finished Drilling
2010-02-24 Well Log Performed
2010-02-24 Well Mode changed to Drilled and Cased
2010-02-25 Well Log Performed
2010-02-27 Liner Casing Operation Performed
2010-02-27 Perforation Treatment Performed - Open-Hole Completion
2010-02-28 Rig Released
2010-04-01 Perforation Treatment Performed - Multi-Stage Fracture
2010-04-02 Well Began Production
2010-04-02 Well Fluid changed to Gas
2010-04-02 Well Mode changed to Flowing
2010-04-06 Well Log Performed
2015-10-01 Well Fluid changed to Gas
2015-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-09 1890.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-27 Open Hole/Barefoot Completion 3630.00 3650.00 0
2010-04-01 Multi-Stage Fracture 2783.50 2784.00 0
2010-04-01 Multi-Stage Fracture 2613.20 2613.70 0
2010-04-01 Multi-Stage Fracture 2541.40 2541.90 0
2010-04-01 Multi-Stage Fracture 3624.50 3625.50 0
2010-04-01 Multi-Stage Fracture 3565.50 3566.00 0
2010-04-01 Multi-Stage Fracture 3425.40 3425.90 0
2010-04-01 Multi-Stage Fracture 3324.80 3325.30 0
2010-04-01 Multi-Stage Fracture 3212.90 3213.40 0
2010-04-01 Multi-Stage Fracture 3087.60 3088.10 0
2010-04-01 Multi-Stage Fracture 2975.70 2976.20 0
2010-04-01 Multi-Stage Fracture 2850.40 2850.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6030 0.0 0.0 0.0
2011 6676 0.0 0.0 0.0
2012 7794 0.0 0.0 0.0
2013 7543 0.0 0.0 0.0
2014 6693 0.0 0.0 0.0
2015 7845 0.0 0.0 0.0
2016 6527 0.0 0.0 0.0
2017 7188 0.0 0.0 0.0
2018 5371 0.0 0.0 0.0
2019 4828 0.0 0.0 0.0
2020 1592 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-04-01 No Incident Encountered 0.00 0.00

For data sources see[7]

References