X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605201516020

Well Details

Well ID: 0605201516020
Loading map...
Location: 02/16-15-060-20W5/0
Location Alias: 02/16-15-60-20 W5M
Location Alias 2: 02/16-15-060-20 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 15
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC 102 HZ KAYBOBS 16-15-60-20
Operator Name: XTO Energy Canada ULC
License Number: 0418518
License Date: 2010-02-10
License Status: Suspension
Spud Date: 2010-03-01
Final Drill Date: 2010-03-23
Well Total Depth: 3396.00 m
Surface Hole Latitude: 54.184114
Surface Hole Longitude: -116.903203

For data sources see[1][2]

Well History

Date Event
2010-02-10 Obtained License
2010-03-04 Surface Casing Operation Performed
2010-03-09 Direction Drilling Operation Performed - Horizontal
2010-03-16 Production Casing Operation Performed
2010-03-23 Finished Drilling
2010-03-23 Well Log Performed
2010-03-23 Well Mode changed to Drilled and Cased
2010-03-24 Well Log Performed
2010-03-25 Liner Casing Operation Performed
2010-03-25 Perforation Treatment Performed - Open-Hole Completion
2010-03-26 Rig Released
2010-03-30 Perforation Treatment Performed - Multi-Stage Fracture
2010-03-31 Well Began Production
2010-03-31 Well Fluid changed to Gas
2010-03-31 Well Mode changed to Flowing
2010-04-04 Well Log Performed
2011-10-01 Well Fluid changed to Gas
2011-10-01 Well Mode changed to Pumping
2016-01-01 Well Fluid changed to Gas
2016-01-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-03-09 2174.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-25 Open Hole/Barefoot Completion 3376.60 3396.00 0
2010-03-30 Multi-Stage Fracture 2624.90 2625.40 0
2010-03-30 Multi-Stage Fracture 2516.20 2516.70 0
2010-03-30 Multi-Stage Fracture 2442.00 2442.50 0
2010-03-30 Multi-Stage Fracture 3371.70 3372.60 0
2010-03-30 Multi-Stage Fracture 3320.60 3321.10 0
2010-03-30 Multi-Stage Fracture 3222.50 3223.00 0
2010-03-30 Multi-Stage Fracture 3124.60 3125.10 0
2010-03-30 Multi-Stage Fracture 3026.40 3026.90 0
2010-03-30 Multi-Stage Fracture 2928.30 2928.80 0
2010-03-30 Multi-Stage Fracture 2819.90 2820.40 0
2010-03-30 Multi-Stage Fracture 2722.50 2723.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 3032 0.0 0.0 0.0
2011 3363 0.0 0.0 0.0
2012 3358 0.0 0.0 0.0
2013 1547 0.0 0.0 0.0
2014 4670 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-03-30 No Incident Encountered 0.00 0.00

For data sources see[7]

References