X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605202105000

Well Details

Well ID: 0605202105000
Loading map...
Location: 00/05-21-060-20W5/0
Location Alias: 00/05-21-60-20 W5M
Location Alias 2: 00/05-21-060-20 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: 2214896AB KAYBOBS 5-21-60-20
Operator Name: 2214896 Alberta Ltd.
License Number: 0457274
License Date: 2013-05-31
License Status: Issued
Spud Date: 2013-08-27
Final Drill Date: 2013-09-11
Well Total Depth: 3607.00 m
Surface Hole Latitude: 54.204070
Surface Hole Longitude: -116.926118

For data sources see[1][2]

Well History

Date Event
2013-05-31 Obtained License
2013-08-28 Lost Circulation Occurred
2013-08-29 Lost Circulation Occurred
2013-08-31 Surface Casing Operation Performed
2013-09-03 Direction Drilling Operation Performed - Deviate
2013-09-06 Direction Drilling Operation Performed - Horizontal
2013-09-06 Well Log Performed
2013-09-11 Finished Drilling
2013-09-11 Well Log Performed
2013-09-11 Well Mode changed to Drilled and Cased
2013-09-14 Perforation Treatment Performed - Open-Hole Completion
2013-09-14 Production Casing Operation Performed
2013-09-15 Rig Released
2013-10-23 Well Log Performed
2013-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2013-11-01 Perforation Treatment Performed - Multi-Stage Fracture
2014-02-14 Well Began Production
2014-02-14 Well Fluid changed to Crude Oil
2014-02-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-08-27 Precision Drilling Corporation 509 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-09-03 1849.70 Deviate (5 - 79 degrees)
2013-09-06 2328.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-09-14 Open Hole/Barefoot Completion 3584.00 3607.00 0
2013-10-31 Multi-Stage Fracture 3210.30 3210.80 0
2013-10-31 Multi-Stage Fracture 3163.00 3163.50 0
2013-10-31 Multi-Stage Fracture 3116.60 3117.10 0
2013-10-31 Multi-Stage Fracture 3054.80 3055.30 0
2013-10-31 Multi-Stage Fracture 3007.30 3007.80 0
2013-10-31 Multi-Stage Fracture 2961.00 2961.50 0
2013-10-31 Multi-Stage Fracture 2901.80 2902.30 0
2013-10-31 Multi-Stage Fracture 2854.90 2855.40 0
2013-10-31 Multi-Stage Fracture 2796.80 2797.30 0
2013-10-31 Multi-Stage Fracture 2748.90 2749.40 0
2013-10-31 Multi-Stage Fracture 3575.10 3575.60 0
2013-10-31 Multi-Stage Fracture 2689.80 2690.30 0
2013-10-31 Multi-Stage Fracture 2643.10 2643.60 0
2013-10-31 Multi-Stage Fracture 2596.30 2596.80 0
2013-10-31 Multi-Stage Fracture 2535.40 2535.90 0
2013-11-01 Multi-Stage Fracture 2489.00 2489.50 0
2013-11-01 Multi-Stage Fracture 2439.80 2440.30 0
2013-11-01 Multi-Stage Fracture 2380.00 2380.50 0
2013-10-31 Multi-Stage Fracture 3574.00 3574.50 0
2013-10-31 Multi-Stage Fracture 3523.40 3523.90 0
2013-10-31 Multi-Stage Fracture 3476.60 3477.10 0
2013-10-31 Multi-Stage Fracture 3429.20 3429.70 0
2013-10-31 Multi-Stage Fracture 3388.40 3388.90 0
2013-10-31 Multi-Stage Fracture 3321.10 3321.60 0
2013-10-31 Multi-Stage Fracture 3272.10 3272.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-10-31 2013-11-01 2,179 479 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 37.4259 N/A
Atlas CRC-LT 20-40 Baker Hughes Crystalline Silica Quartz 14808-60-7 100 24.7629 N/A
Phenolic Resin 37337-65-8 100 24.7629 N/A
Phenolic Resin 9003-35-4 100 24.7629 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 9.2408 N/A
CC-2 Baker Hughes Clay Control Non-hazardous Not Available 100 0.0823 N/A
FP-13L Baker Hughes Defoamer Tributyl phosphate 126-73-8 100 0.0032 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 28.0333 N/A
FAC-1W Baker Hughes Gelling Agent Isopropanol 67-63-0 100 0.0475 N/A
N.N-Dimethyloctadecylamine 124-28-7 100 0.0476 N/A
N.N-Dimethyloctadecylamine hydrochloride 1613-17-8 100 0.0476 N/A
Trimethyloctadecylammonium chloride 112-03-8 100 0.0475 N/A
FAC-3W Baker Hughes Gelling Agent Isopropanol 67-63-0 100 0.4037 N/A
Sodium xylene sulphonate 1300-72-7 100 0.4037 N/A
Trimethyloctadecylammonium chloride 112-03-8 100 0.4037 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-10-23 2013-10-31 Surface Water - Runoff 558

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 6500 0.0 0.0 0.0
2015 6908 0.0 0.0 0.0
2016 5469 0.0 0.0 0.0
2017 7945 0.0 0.0 0.0
2018 7322 0.0 0.0 0.0
2019 6685 0.0 0.0 0.0
2020 1063 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-08-28 Lost Circulation 55.00 100.00
2013-08-28 Lost Circulation 100.00 100.00
2013-08-29 Lost Circulation 149.00 160.00
2013-08-29 Lost Circulation 200.00 200.00
2013-11-12 No Incident Encountered 0.00 0.00

For data sources see[10]

References