X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605202112020

Well Details

Well ID: 0605202112020
Loading map...
Location: 02/12-21-060-20W5/0
Location Alias: 02/12-21-60-20 W5M
Location Alias 2: 02/12-21-060-20 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: 2214896AB KAYBOBS 12-21-60-20
Operator Name: 2214896 Alberta Ltd.
License Number: 0457275
License Date: 2013-05-31
License Status: Issued
Spud Date: 2013-09-17
Final Drill Date: 2013-10-01
Well Total Depth: 3605.00 m
Surface Hole Latitude: 54.204182
Surface Hole Longitude: -116.925991

For data sources see[1][2]

Well History

Date Event
2013-05-31 Obtained License
2013-09-17 Lost Circulation Occurred
2013-09-18 Lost Circulation Occurred
2013-09-20 Surface Casing Operation Performed
2013-09-23 Direction Drilling Operation Performed - Deviate
2013-09-25 Direction Drilling Operation Performed - Horizontal
2013-09-26 Well Log Performed
2013-10-01 Finished Drilling
2013-10-01 Well Log Performed
2013-10-01 Well Mode changed to Drilled and Cased
2013-10-04 Perforation Treatment Performed - Open-Hole Completion
2013-10-04 Production Casing Operation Performed
2013-10-05 Rig Released
2013-10-23 Well Log Performed
2013-10-29 Perforation Treatment Performed - Multi-Stage Fracture
2013-10-30 Perforation Treatment Performed - Multi-Stage Fracture
2014-02-15 Well Began Production
2014-02-15 Well Fluid changed to Crude Oil
2014-02-15 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-09-17 Precision Drilling Corporation 509 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-09-23 1841.30 Deviate (5 - 79 degrees)
2013-09-25 2338.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-10-04 Open Hole/Barefoot Completion 3575.00 3605.00 0
2013-10-29 Multi-Stage Fracture 3103.90 3104.40 0
2013-10-29 Multi-Stage Fracture 3042.30 3043.00 0
2013-10-29 Multi-Stage Fracture 2994.40 2994.90 0
2013-10-30 Multi-Stage Fracture 2884.00 2884.50 0
2013-10-30 Multi-Stage Fracture 2836.20 2836.70 0
2013-10-30 Multi-Stage Fracture 2788.50 2789.00 0
2013-10-30 Multi-Stage Fracture 2726.70 2727.20 0
2013-10-30 Multi-Stage Fracture 2678.70 2679.20 0
2013-10-30 Multi-Stage Fracture 2630.70 2631.20 0
2013-10-30 Multi-Stage Fracture 2571.70 2572.20 0
2013-10-29 Multi-Stage Fracture 3551.10 3551.60 0
2013-10-30 Multi-Stage Fracture 2524.60 2525.10 0
2013-10-30 Multi-Stage Fracture 2478.70 2479.20 0
2013-10-30 Multi-Stage Fracture 2419.30 2419.80 0
2013-10-30 Multi-Stage Fracture 2371.30 2371.80 0
2013-10-29 Multi-Stage Fracture 3550.10 3550.60 0
2013-10-29 Multi-Stage Fracture 3386.70 3387.20 0
2013-10-29 Multi-Stage Fracture 3353.70 3354.20 0
2013-10-29 Multi-Stage Fracture 3305.90 3306.40 0
2013-10-29 Multi-Stage Fracture 3258.00 3258.50 0
2013-10-29 Multi-Stage Fracture 3195.40 3195.90 0
2013-10-29 Multi-Stage Fracture 3149.20 3149.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-10-29 2013-10-30 2,181 426 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 42.9223 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 12.1198 N/A
SB PRIME 20/40 Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 11.0891 N/A
CC-2 Baker Hughes Clay Control Non-hazardous Not Available 100 0.0917 N/A
FP-13L Baker Hughes Defoamer Tributyl phosphate 126-73-8 100 0.0039 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 33.2401 N/A
FAC-1W Baker Hughes Gelling Agent Isopropanol 67-63-0 100 0.0562 N/A
N.N-Dimethyloctadecylamine 124-28-7 100 0.0563 N/A
N.N-Dimethyloctadecylamine hydrochloride 1613-17-8 100 0.0563 N/A
Trimethyloctadecylammonium chloride 112-03-8 100 0.0562 N/A
FAC-3W Baker Hughes Gelling Agent Isopropanol 67-63-0 100 0.4765 N/A
Sodium xylene sulphonate 1300-72-7 100 0.4765 N/A
Trimethyloctadecylammonium chloride 112-03-8 100 0.4765 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-10-19 2013-12-03 Surface Water - Runoff 2455

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 6282 0.0 0.0 0.0
2015 7489 0.0 0.0 0.0
2016 7959 0.0 0.0 0.0
2017 7812 0.0 0.0 0.0
2018 7545 0.0 0.0 0.0
2019 6223 0.0 0.0 0.0
2020 1704 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-09-17 Lost Circulation 52.00 104.00
2013-09-18 Lost Circulation 135.00 202.00
2013-12-05 No Incident Encountered 0.00 0.00

For data sources see[10]

References