If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0605202112020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.204182,"lon":-116.925991,"icon":""}]} |
Location: 02/12-21-060-20W5/0 | |
Location Alias: 02/12-21-60-20 W5M | |
Location Alias 2: 02/12-21-060-20 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 5 | |
Range: 20 | |
Section: 21 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: 2214896AB KAYBOBS 12-21-60-20 | |
Operator Name: 2214896 Alberta Ltd. | |
License Number: 0457275 | |
License Date: 2013-05-31 | |
License Status: Issued | |
Spud Date: 2013-09-17 | |
Final Drill Date: 2013-10-01 | |
Well Total Depth: 3605.00 m | |
Surface Hole Latitude: 54.204182 | |
Surface Hole Longitude: -116.925991 |
Date | Event |
---|---|
2013-05-31 | Obtained License |
2013-09-17 | Lost Circulation Occurred |
2013-09-18 | Lost Circulation Occurred |
2013-09-20 | Surface Casing Operation Performed |
2013-09-23 | Direction Drilling Operation Performed - Deviate |
2013-09-25 | Direction Drilling Operation Performed - Horizontal |
2013-09-26 | Well Log Performed |
2013-10-01 | Finished Drilling |
2013-10-01 | Well Log Performed |
2013-10-01 | Well Mode changed to Drilled and Cased |
2013-10-04 | Perforation Treatment Performed - Open-Hole Completion |
2013-10-04 | Production Casing Operation Performed |
2013-10-05 | Rig Released |
2013-10-23 | Well Log Performed |
2013-10-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-10-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-02-15 | Well Began Production |
2014-02-15 | Well Fluid changed to Crude Oil |
2014-02-15 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-09-17 | Precision Drilling Corporation | 509 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-09-23 | 1841.30 | Deviate (5 - 79 degrees) |
2013-09-25 | 2338.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-10-04 | Open Hole/Barefoot Completion | 3575.00 | 3605.00 | 0 |
2013-10-29 | Multi-Stage Fracture | 3103.90 | 3104.40 | 0 |
2013-10-29 | Multi-Stage Fracture | 3042.30 | 3043.00 | 0 |
2013-10-29 | Multi-Stage Fracture | 2994.40 | 2994.90 | 0 |
2013-10-30 | Multi-Stage Fracture | 2884.00 | 2884.50 | 0 |
2013-10-30 | Multi-Stage Fracture | 2836.20 | 2836.70 | 0 |
2013-10-30 | Multi-Stage Fracture | 2788.50 | 2789.00 | 0 |
2013-10-30 | Multi-Stage Fracture | 2726.70 | 2727.20 | 0 |
2013-10-30 | Multi-Stage Fracture | 2678.70 | 2679.20 | 0 |
2013-10-30 | Multi-Stage Fracture | 2630.70 | 2631.20 | 0 |
2013-10-30 | Multi-Stage Fracture | 2571.70 | 2572.20 | 0 |
2013-10-29 | Multi-Stage Fracture | 3551.10 | 3551.60 | 0 |
2013-10-30 | Multi-Stage Fracture | 2524.60 | 2525.10 | 0 |
2013-10-30 | Multi-Stage Fracture | 2478.70 | 2479.20 | 0 |
2013-10-30 | Multi-Stage Fracture | 2419.30 | 2419.80 | 0 |
2013-10-30 | Multi-Stage Fracture | 2371.30 | 2371.80 | 0 |
2013-10-29 | Multi-Stage Fracture | 3550.10 | 3550.60 | 0 |
2013-10-29 | Multi-Stage Fracture | 3386.70 | 3387.20 | 0 |
2013-10-29 | Multi-Stage Fracture | 3353.70 | 3354.20 | 0 |
2013-10-29 | Multi-Stage Fracture | 3305.90 | 3306.40 | 0 |
2013-10-29 | Multi-Stage Fracture | 3258.00 | 3258.50 | 0 |
2013-10-29 | Multi-Stage Fracture | 3195.40 | 3195.90 | 0 |
2013-10-29 | Multi-Stage Fracture | 3149.20 | 3149.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-10-29 | 2013-10-30 | 2,181 | 426 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 42.9223 | N/A | |||
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 12.1198 | N/A | ||
SB PRIME 20/40 | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 11.0891 | N/A | ||
CC-2 | Baker Hughes | Clay Control | Non-hazardous | Not Available | 100 | 0.0917 | N/A | |
FP-13L | Baker Hughes | Defoamer | Tributyl phosphate | 126-73-8 | 100 | 0.0039 | N/A | |
Nitrogen | Baker Hughes | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 33.2401 | N/A | |
FAC-1W | Baker Hughes | Gelling Agent | Isopropanol | 67-63-0 | 100 | 0.0562 | N/A | |
N.N-Dimethyloctadecylamine | 124-28-7 | 100 | 0.0563 | N/A | ||||
N.N-Dimethyloctadecylamine hydrochloride | 1613-17-8 | 100 | 0.0563 | N/A | ||||
Trimethyloctadecylammonium chloride | 112-03-8 | 100 | 0.0562 | N/A | ||||
FAC-3W | Baker Hughes | Gelling Agent | Isopropanol | 67-63-0 | 100 | 0.4765 | N/A | |
Sodium xylene sulphonate | 1300-72-7 | 100 | 0.4765 | N/A | ||||
Trimethyloctadecylammonium chloride | 112-03-8 | 100 | 0.4765 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-10-19 | 2013-12-03 | Surface Water - Runoff | 2455 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 6282 | 0.0 | 0.0 | 0.0 |
2015 | 7489 | 0.0 | 0.0 | 0.0 |
2016 | 7959 | 0.0 | 0.0 | 0.0 |
2017 | 7812 | 0.0 | 0.0 | 0.0 |
2018 | 7545 | 0.0 | 0.0 | 0.0 |
2019 | 6223 | 0.0 | 0.0 | 0.0 |
2020 | 1704 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-09-17 | Lost Circulation | 52.00 | 104.00 |
2013-09-18 | Lost Circulation | 135.00 | 202.00 |
2013-12-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]