X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605211303000

Well Details

Well ID: 0605211303000
Loading map...
Location: 00/03-13-060-21W5/0
Location Alias: 00/03-13-60-21 W5M
Location Alias 2: 00/03-13-060-21 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 21
Section: 13
County/Municipality: Municipal District of Greenview No. 16
Well Name: TALISMAN HZ FIR 3-13-60-21
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0446531
License Date: 2012-06-14
License Status: Issued
Spud Date: 2012-09-18
Final Drill Date: 2012-10-05
Well Total Depth: 2936.00 m
Surface Hole Latitude: 54.194986
Surface Hole Longitude: -117.015665

For data sources see[1][2]

Well History

Date Event
2012-06-14 Obtained License
2012-09-18 Lost Circulation Occurred
2012-09-19 Plug Back Performed
2012-09-20 Plug Back Performed
2012-09-23 Surface Casing Operation Performed
2012-09-26 Direction Drilling Operation Performed - Deviate
2012-09-26 Well Log Performed
2012-09-28 Well Log Performed
2012-09-29 Intermediate Casing Operation Performed
2012-09-30 Direction Drilling Operation Performed - Horizontal
2012-10-05 Finished Drilling
2012-10-05 Perforation Treatment Performed - Open-Hole Completion
2012-10-05 Well Log Performed
2012-10-05 Well Mode changed to Drilled and Cased
2012-10-07 Production Casing Operation Performed
2012-10-08 Rig Released
2013-01-09 Perforation Treatment Performed - Multi-Stage Fracture
2013-01-10 Perforation Treatment Performed - Multi-Stage Fracture
2013-01-15 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-05 Well Began Production
2013-03-05 Well Fluid changed to Crude Oil
2013-03-05 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-09-18 Ensign Drilling Inc. 52 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-09-26 1265.00 Deviate (5 - 79 degrees)
2012-09-30 1785.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-05 Open Hole/Barefoot Completion 2918.00 2936.00 0
2013-01-10 Multi-Stage Fracture 2299.70 2300.10 0
2013-01-15 Multi-Stage Fracture 2204.70 2205.10 0
2013-01-15 Multi-Stage Fracture 2122.20 2122.60 0
2013-01-15 Multi-Stage Fracture 2026.30 2026.70 0
2013-01-15 Multi-Stage Fracture 1943.60 1944.00 0
2013-01-15 Multi-Stage Fracture 1874.90 1875.40 0
2013-01-15 Multi-Stage Fracture 1818.30 1818.80 0
2013-01-09 Multi-Stage Fracture 2874.40 2875.20 0
2013-01-09 Multi-Stage Fracture 2779.00 2779.40 0
2013-01-09 Multi-Stage Fracture 2709.80 2710.30 0
2013-01-09 Multi-Stage Fracture 2640.00 2640.40 0
2013-01-09 Multi-Stage Fracture 2594.00 2594.50 0
2013-01-09 Multi-Stage Fracture 2523.90 2524.30 0
2013-01-10 Multi-Stage Fracture 2453.00 2453.50 0
2013-01-10 Multi-Stage Fracture 2369.80 2370.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-01-09 2013-01-15 1,621 1,707 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 nitrogen 7727-37-9 100 6.8337 N/A
Water Not Available 100 75.3529 N/A
Frac Sand - regular Trican silica crystalline 14808-60-7 100 8.6961 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0061 N/A
CC-55 Trican Clay Control 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide 7744 100 0.1819 N/A
formic acid 64-18-6 100 0.182 N/A
non-hazardous ingredients Not Available 100 0.1819 N/A
DF-1 Trican Defoamer non-hazardous ingredients Not Available 100 0.0017 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0538 N/A
propylene glycol 57-55-6 100 0.0538 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0389 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0389 N/A
non-hazardous ingredients Not Available 100 0.0389 N/A
WG-111D Trican Gelling Agent guar gum 9000-30-0 100 0.1381 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-01-04 2013-01-07 Surface Water - River 1032
2012-12-16 2013-01-15 Municipal Water 675

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 7083 0.0 0.0 0.0
2014 8015 0.0 0.0 0.0
2015 8753 0.0 0.0 0.0
2016 8201 0.0 0.0 0.0
2017 7502 0.0 0.0 0.0
2018 7736 0.0 0.0 0.0
2019 7195 0.0 0.0 0.0
2020 1939 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-18 Lost Circulation 55.00 150.00
2013-02-05 No Incident Encountered 0.00 0.00

For data sources see[10]

References