X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605212004000

Well Details

Well ID: 0605212004000
Loading map...
Location: 00/04-20-060-21W5/0
Location Alias: 00/04-20-60-21 W5M
Location Alias 2: 00/04-20-060-21 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 21
Section: 20
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACL FIR 4-20-60-21
Operator Name: Paramount Resources Ltd.
License Number: 0249748
License Date: 2001-01-25
License Status: Issued
Spud Date: 2001-03-04
Final Drill Date: 2001-03-15
Well Total Depth: 2564.00 m
Surface Hole Latitude: 54.199146
Surface Hole Longitude: -117.120615

For data sources see[1][2]

Well History

Date Event
2001-01-25 Obtained License
2001-03-05 Surface Casing Operation Performed
2001-03-15 Finished Drilling
2001-03-15 Well Log Performed
2001-03-16 Well Log Performed
2001-03-17 Production Casing Operation Performed
2001-03-18 Rig Released
2001-03-18 Well Mode changed to Drilled and Cased
2001-03-25 Well Log Performed
2001-03-26 Perforation Treatment Performed - Jet Perforation
2001-03-26 Well Log Performed
2001-03-27 Perforation Treatment Performed - Cement Squeeze
2001-03-29 Perforation Treatment Performed - Jet Perforation
2001-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-04-02 Perforation Treatment Performed - Fractured
2001-04-11 Perforation Treatment Performed - Bridge Plug No Cement Required
2001-04-11 Perforation Treatment Performed - Jet Perforation
2001-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-04-13 Perforation Treatment Performed - Fractured
2002-11-08 Well Log Performed
2002-11-09 Perforation Treatment Performed - Jet Perforation
2002-11-09 Well Log Performed
2002-11-12 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-03-26 Perforation 483.00 484.00 12
2001-04-02 Fracture 2470.00 2474.00 0
2001-04-02 Fracture 2461.50 2466.00 0
2001-04-11 Perforation 2407.00 2410.00 17
2001-04-11 Bridge Plug, No Cement 2457.00 2457.50 0
2001-04-13 Acid Treatment 2407.00 2410.00 0
2001-04-13 Fracture 2407.00 2410.00 0
2002-11-09 Perforation 1965.00 1975.00 17
2002-11-12 Fracture 1965.00 1975.00 0
2001-03-27 Cement Squeeze 483.00 484.00 0
2001-03-29 Perforation 2481.00 2485.00 17
2001-03-29 Perforation 2470.00 2474.00 17
2001-03-29 Perforation 2461.50 2466.00 17
2001-04-02 Acid Treatment 2481.00 2485.00 0
2001-04-02 Acid Treatment 2470.00 2474.00 0
2001-04-02 Acid Treatment 2461.50 2466.00 0
2001-04-02 Fracture 2481.00 2485.00 0

For data sources see[4]



References