X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605232710000

Well Details

Well ID: 0605232710000
Loading map...
Location: 00/10-27-060-23W5/0
Location Alias: 00/10-27-60-23 W5M
Location Alias 2: 00/10-27-060-23 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 23
Section: 27
County/Municipality: Municipal District of Greenview No. 16
Well Name: DELPHI HZ PLACID 10-27-60-23
Operator Name: Delphi Energy Corp.
License Number: 0451684
License Date: 2012-12-10
License Status: Amended
Spud Date: 2012-12-31
Final Drill Date: 2013-01-31
Well Total Depth: 5260.00 m
Surface Hole Latitude: 54.193194
Surface Hole Longitude: -117.360563

For data sources see[1][2]

Well History

Date Event
2012-12-10 Obtained License
2013-01-02 Surface Casing Operation Performed
2013-01-07 Intermediate Casing Operation Performed
2013-01-08 Direction Drilling Operation Performed - Deviate
2013-01-14 Direction Drilling Operation Performed - Horizontal
2013-01-18 Well Log Performed
2013-01-31 Finished Drilling
2013-01-31 Well Mode changed to Drilled and Cased
2013-02-04 Liner Casing Operation Performed
2013-02-04 Perforation Treatment Performed - Open-Hole Completion
2013-02-05 Rig Released
2013-02-20 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-21 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-22 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-23 Well Began Production
2013-02-23 Well Fluid changed to Gas
2013-02-23 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2013-01-08 2383.30 Deviate (5 - 79 degrees)
2013-01-14 2802.10 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-02-04 Open Hole/Barefoot Completion 5248.00 5260.00 0
2013-02-21 Multi-Stage Fracture 4592.30 4592.40 0
2013-02-21 Multi-Stage Fracture 4506.30 4506.40 0
2013-02-21 Multi-Stage Fracture 4435.50 4435.60 0
2013-02-21 Multi-Stage Fracture 4349.80 4349.90 0
2013-02-21 Multi-Stage Fracture 4265.70 4265.80 0
2013-02-21 Multi-Stage Fracture 4179.60 4179.70 0
2013-02-21 Multi-Stage Fracture 4095.30 4095.40 0
2013-02-21 Multi-Stage Fracture 4012.50 4012.60 0
2013-02-21 Multi-Stage Fracture 3940.10 3940.20 0
2013-02-21 Multi-Stage Fracture 3854.20 3854.30 0
2013-02-20 Multi-Stage Fracture 5215.20 5215.30 0
2013-02-22 Multi-Stage Fracture 3770.70 3770.80 0
2013-02-22 Multi-Stage Fracture 3684.90 3685.00 0
2013-02-22 Multi-Stage Fracture 3612.60 3612.70 0
2013-02-22 Multi-Stage Fracture 3526.70 3526.80 0
2013-02-22 Multi-Stage Fracture 3440.80 3440.90 0
2013-02-22 Multi-Stage Fracture 3368.60 3368.70 0
2013-02-22 Multi-Stage Fracture 3282.80 3282.90 0
2013-02-22 Multi-Stage Fracture 3197.70 3197.80 0
2013-02-22 Multi-Stage Fracture 3111.30 3111.40 0
2013-02-22 Multi-Stage Fracture 3038.80 3038.90 0
2013-02-20 Multi-Stage Fracture 5143.00 5143.10 0
2013-02-22 Multi-Stage Fracture 2953.00 2953.10 0
2013-02-22 Multi-Stage Fracture 2881.40 2881.50 0
2013-02-20 Multi-Stage Fracture 5073.40 5073.50 0
2013-02-20 Multi-Stage Fracture 5002.30 5002.40 0
2013-02-21 Multi-Stage Fracture 4916.40 4916.50 0
2013-02-21 Multi-Stage Fracture 4836.60 4836.70 0
2013-02-21 Multi-Stage Fracture 4750.60 4750.70 0
2013-02-21 Multi-Stage Fracture 4678.20 4678.30 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-02-20 2013-02-22 2,662 10,352 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 3.6137 N/A
water 7732-18-5 100 79.8844 N/A
Econo-Prop (20/40) Trican amorphous silicon dioxide 7631-86-9 100 1.4954 N/A
mullite 1302-93-8 100 1.4954 N/A
silica crystalline-cristobalite 14464-46-1 100 1.4954 N/A
Sand (20/40) Trican silica crystalline 14808-60-7 100 6.5046 N/A
Sand (40/70) Trican silica crystalline 14808-60-7 100 6.4656 N/A
Sand (50/140) Trican silica crystalline 14808-60-7 100 2.0876 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0067 N/A
dibromoacetonitrile 3252-43-5 100 0.0067 N/A
non-hazardous ingredients Not Available 100 0.0067 N/A
polyethylene glycol 25322-68-3 100 0.0067 N/A
sodium bromide 7647-15-6 100 0.0067 N/A
Breaker MR Trican Breaker ammonium persulfate 7727-54-0 100 0.0031 N/A
DRA-90 Trican Buffer non-hazardous ingredients Not Available 100 0.0298 N/A
CC-55 Trican Clay Control 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide 7744 100 0.1757 N/A
formic acid 64-18-6 100 0.1757 N/A
non-hazardous ingredients Not Available 100 0.1757 N/A
WXB-3 Trican Crosslinker diesel fuel 68334-30-5 100 0.1171 N/A
non-hazardous ingredients Not Available 100 0.1171 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0677 N/A
propylene glycol 57-55-6 100 0.0677 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0598 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0598 N/A
non-hazardous ingredients Not Available 100 0.0598 N/A
WG-111L Rapid Gellant Trican Gelling Agent distillates (petroleum). hydrotreated middle 64742-46-7 100 0.1387 N/A
polysaccharide blend Not Available 100 0.1387 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-01-24 2013-02-06 Surface Water - Runoff 5778
2013-02-07 2013-02-15 Surface Water - Runoff 4583

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 6454 0.0 0.0 0.0
2014 7883 0.0 0.0 0.0
2015 8028 0.0 0.0 0.0
2016 7775 0.0 0.0 0.0
2017 7559 0.0 0.0 0.0
2018 8495 0.0 0.0 0.0
2019 8663 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-05 No Incident Encountered 0.00 0.00
2013-03-04 No Incident Encountered 0.00 0.00

For data sources see[9]

References