X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605250412000

Well Details

Well ID: 0605250412000
Loading map...
Location: 00/12-04-060-25W5/0
Location Alias: 00/12-04-60-25 W5M
Location Alias 2: 00/12-04-060-25 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 25
Section: 04
County/Municipality: Municipal District of Greenview No. 16
Well Name: DELPHI LELAND 12-4-60-25
Operator Name: Delphi Energy Corp.
License Number: 0091381
License Date: 1981-07-22
License Status: Issued
Spud Date: 1981-08-14
Final Drill Date: 1981-09-21
Well Total Depth: 3020.00 m
Surface Hole Latitude: 54.163002
Surface Hole Longitude: -117.694972

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-07-22 Obtained License
1981-08-15 Lost Circulation Occurred
1981-08-17 Lost Circulation Occurred
1981-09-15 Drill Stem Test Performed
1981-09-21 Finished Drilling
1981-09-24 Drill Stem Test Performed
1981-10-01 Production Casing Operation Performed
1981-10-23 Perforation Treatment Performed - Jet Perforation
1981-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-10-29 Perforation Treatment Performed - Jet Perforation
1981-11-03 Perforation Treatment Performed - Fractured
1981-11-06 Well Mode changed to Drilled and Cased
1995-03-01 Well Began Production
1995-03-01 Well Fluid changed to Gas
1995-03-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-10-23 Perforation 2925.00 2928.00 13
1981-10-26 Acid Treatment 2925.00 2928.00 0
1981-10-28 Packing Device Capped w/Cement 2917.00 2923.00 0
1981-10-29 Perforation 2887.50 2892.50 13
1981-10-29 Perforation 2900.50 2902.50 13
1981-10-29 Perforation 2907.50 2909.50 13
1981-11-03 Fracture 2887.50 2909.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 3535 0.0 0.0 0.0
1996 2273 0.0 0.0 0.0
1997 2856 0.0 0.0 0.0
1998 1737 0.0 0.0 0.0
1999 1046 0.0 0.0 0.0
2000 3334 0.0 0.0 0.0
2001 5179 0.0 0.0 0.0
2002 5424 0.0 0.0 0.0
2003 5961 0.0 0.0 0.0
2004 3660 0.0 0.0 0.0
2005 8567 0.0 0.0 0.0
2006 6905 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 7991 0.0 0.0 0.0
2009 8688 0.0 0.0 0.0
2010 8543 0.0 0.0 0.0
2011 8734 0.0 0.0 0.0
2012 8741 0.0 0.0 0.0
2013 8681 0.0 0.0 0.0
2014 8402 0.0 0.0 0.0
2015 4944 0.0 0.0 0.0
2016 6555 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8735 0.0 0.0 0.0
2019 3672 0.0 0.0 0.0
2020 696 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-08-15 Lost Circulation 120.00 120.00
1981-08-17 Lost Circulation 255.00 255.00

For data sources see[6]

References