X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0606010501002

Well Details

Well ID: 0606010501002
Loading map...
Location: 00/01-05-060-01W6/2
Location Alias: 00/01-05-60-01 W6M
Location Alias 2: 00/01-05-060-01 W6/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 6
Range: 01
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ WANYAN 1-5-60-1
Operator Name: XTO Energy Canada ULC
License Number: 0436009
License Date: 2011-08-12
License Status: Amended
Spud Date: 2011-09-11
Final Drill Date: 2011-11-27
Well Total Depth: 5300.00 m
Surface Hole Latitude: 54.168909
Surface Hole Longitude: -118.103813

For data sources see[1][2]

Well History

Date Event
2011-08-12 Obtained License
2011-09-14 Surface Casing Operation Performed
2011-09-25 Intermediate Casing Operation Performed
2011-10-26 Direction Drilling Operation Performed - Horizontal
2011-11-03 Production Casing Operation Performed
2011-11-22 Well Log Performed
2011-11-27 Finished Drilling
2011-11-27 Well Log Performed
2011-11-27 Well Mode changed to Drilled and Cased
2011-11-30 Liner Casing Operation Performed
2011-11-30 Perforation Treatment Performed - Open-Hole Completion
2011-12-02 Rig Released
2011-12-14 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-15 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-16 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-17 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-21 Well Began Production
2011-12-21 Well Fluid changed to Gas
2011-12-21 Well Mode changed to Flowing
2014-04-09 Well Fluid changed to Gas
2014-04-09 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-26 3370.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-30 Open Hole/Barefoot Completion 5295.00 5300.00 0
2011-12-16 Multi-Stage Fracture 4412.20 4413.90 0
2011-12-16 Multi-Stage Fracture 4299.30 4300.90 0
2011-12-16 Multi-Stage Fracture 4185.70 4187.40 0
2011-12-16 Multi-Stage Fracture 4071.40 4073.00 0
2011-12-17 Multi-Stage Fracture 3970.70 3972.40 0
2011-12-17 Multi-Stage Fracture 3857.00 3858.70 0
2011-12-17 Multi-Stage Fracture 3757.00 3758.60 0
2011-12-17 Multi-Stage Fracture 3632.60 3634.20 0
2011-12-17 Multi-Stage Fracture 3544.40 3546.00 0
2011-12-14 Multi-Stage Fracture 5285.20 5286.50 0
2011-12-14 Multi-Stage Fracture 5206.10 5207.80 0
2011-12-15 Multi-Stage Fracture 5091.80 5093.50 0
2011-12-15 Multi-Stage Fracture 4979.80 4980.10 0
2011-12-15 Multi-Stage Fracture 4863.30 4863.60 0
2011-12-15 Multi-Stage Fracture 4757.50 4759.10 0
2011-12-15 Multi-Stage Fracture 4647.80 4649.40 0
2011-12-16 Multi-Stage Fracture 4535.70 4537.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 251 0.0 0.0 0.0
2012 6981 0.0 0.0 0.0
2013 4292 0.0 0.0 0.0
2014 4583 0.0 0.0 0.0
2015 4621 0.0 0.0 0.0
2016 5004 0.0 0.0 0.0
2017 7290 0.0 0.0 0.0
2018 5866 0.0 0.0 0.0
2019 2013 0.0 0.0 0.0
2020 312 0.0 0.0 0.0

For data sources see[6]

References