X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0606023002000

Well Details

Well ID: 0606023002000
Loading map...
Location: 00/02-30-060-02W6/0
Location Alias: 00/02-30-60-02 W6M
Location Alias 2: 00/02-30-060-02 W6/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 6
Range: 02
Section: 30
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ RESTHA 2-30-60-2
Operator Name: XTO Energy Canada ULC
License Number: 0439716
License Date: 2011-11-25
License Status: Issued
Spud Date: 2011-12-09
Final Drill Date: 2012-01-29
Well Total Depth: 5177.00 m
Surface Hole Latitude: 54.226173
Surface Hole Longitude: -118.287503

For data sources see[1][2]

Well History

Date Event
2011-11-25 Obtained License
2011-12-15 Surface Casing Operation Performed
2012-01-06 Direction Drilling Operation Performed - Horizontal
2012-01-15 Production Casing Operation Performed
2012-01-29 Finished Drilling
2012-01-29 Well Log Performed
2012-01-29 Well Mode changed to Drilled and Cased
2012-01-30 Well Log Performed
2012-02-02 Liner Casing Operation Performed
2012-02-02 Perforation Treatment Performed - Open-Hole Completion
2012-02-04 Rig Released
2012-02-11 Well Log Performed
2012-02-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-16 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-17 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-18 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-24 Well Began Production
2012-02-24 Well Fluid changed to Gas
2012-02-24 Well Mode changed to Flowing
2012-03-02 Well Log Performed
2014-04-09 Well Fluid changed to Gas
2014-04-09 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-01-06 3377.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-02 Open Hole/Barefoot Completion 5172.00 5177.00 0
2012-02-16 Multi-Stage Fracture 4386.10 4387.80 0
2012-02-17 Multi-Stage Fracture 4278.20 4279.80 0
2012-02-17 Multi-Stage Fracture 4184.30 4186.00 0
2012-02-17 Multi-Stage Fracture 4090.40 4092.10 0
2012-02-17 Multi-Stage Fracture 3965.80 3967.50 0
2012-02-17 Multi-Stage Fracture 3867.70 3869.40 0
2012-02-18 Multi-Stage Fracture 3759.20 3760.80 0
2012-02-18 Multi-Stage Fracture 3697.20 3698.90 0
2012-02-14 Multi-Stage Fracture 5161.90 5163.20 0
2012-02-14 Multi-Stage Fracture 5096.90 5098.60 0
2012-02-15 Multi-Stage Fracture 4987.20 4987.50 0
2012-02-15 Multi-Stage Fracture 4893.50 4893.90 0
2012-02-15 Multi-Stage Fracture 4792.10 4793.80 0
2012-02-15 Multi-Stage Fracture 4694.20 4695.90 0
2012-02-15 Multi-Stage Fracture 4582.00 4583.70 0
2012-02-16 Multi-Stage Fracture 4492.40 4494.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6068 0.0 0.0 0.0
2013 5055 0.0 0.0 0.0
2014 5508 0.0 0.0 0.0
2015 5957 0.0 0.0 0.0
2016 7593 0.0 0.0 0.0
2017 3897 0.0 0.0 0.0
2018 3226 0.0 0.0 0.0
2019 1742 0.0 0.0 0.0
2020 738 0.0 0.0 0.0

For data sources see[6]

References