X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615051606000

Well Details

Well ID: 0615051606000
Loading map...
Location: 00/06-16-061-05W5/0
Location Alias: 00/06-16-61-05 W5M
Location Alias 2: 00/06-16-061-05 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 05
Section: 16
County/Municipality: County of Barrhead No. 11
Well Name: WLEC NEERLND 6-16-61-5
Operator Name: West Lake Energy Corp.
License Number: 0064972
License Date: 1977-07-27
License Status: Issued
Spud Date: 1977-07-31
Final Drill Date: 1977-08-09
Well Total Depth: 1173.50 m
Surface Hole Latitude: 54.272951
Surface Hole Longitude: -114.693093

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-07-27 Obtained License
1977-08-07 Drill Stem Test Performed
1977-08-08 Drill Stem Test Performed
1977-08-09 Finished Drilling
1977-08-09 Production Casing Operation Performed
1977-10-04 Perforation Treatment Performed - Jet Perforation
1977-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-10-10 Perforation Treatment Performed - Jet Perforation
1977-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-17 Perforation Treatment Performed - Jet Perforation
1977-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-26 Perforation Treatment Performed - Jet Perforation
1977-10-29 Perforation Treatment Performed - Cement Squeeze
1977-10-30 Perforation Treatment Performed - Cement Squeeze
1977-10-31 Perforation Treatment Performed - Jet Perforation
1977-11-01 Perforation Treatment Performed - Jet Perforation
1977-11-04 Well Mode changed to Drilled and Cased
1993-10-18 Well Began Production
1993-10-18 Well Fluid changed to Gas
1993-10-18 Well Mode changed to Flowing
1996-02-28 Perforation Treatment Performed - Cement Squeeze
1996-02-28 Plug Back Performed
1996-02-28 Well Fluid changed to Gas
1996-02-28 Well Mode changed to Suspended
1996-03-01 Perforation Treatment Performed - Jet Perforation
1996-03-03 Well Log Performed
1996-03-04 Well Fluid changed to Gas
1996-03-04 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-10-04 Perforation 1150.30 1151.50 7
1977-10-26 Perforation 959.50 960.10 7
1977-10-26 Acid Treatment 959.50 960.10 0
1977-10-29 Cement Squeeze 959.50 960.10 0
1977-10-30 Cement Squeeze 959.50 960.10 7
1977-10-31 Perforation 954.00 954.60 7
1977-11-01 Perforation 947.30 951.00 7
1996-02-28 Cement Squeeze 947.30 954.60 0
1996-03-01 Perforation 1125.60 1127.50 7
1996-03-01 Perforation 1129.00 1130.00 7
1996-03-01 Perforation 1134.20 1135.70 7
1977-10-05 Acid Treatment 1150.30 1151.50 0
1977-10-09 Packing Device Capped w/Cement 1146.00 1146.00 0
1977-10-10 Perforation 1134.20 1135.70 7
1977-10-11 Acid Treatment 1134.20 1135.70 0
1977-10-17 Perforation 1125.60 1127.50 7
1977-10-17 Perforation 1129.00 1130.20 7
1977-10-18 Acid Treatment 1125.60 1130.20 0
1977-10-25 Packing Device Capped w/Cement 1106.40 1106.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1681 0.0 0.0 0.0
1994 6118 0.0 0.0 0.0
1995 5527 0.0 0.0 0.0

For data sources see[5]

References