X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615150602000

Well Details

Well ID: 0615150602000
Loading map...
Location: 00/02-06-061-15W5/0
Location Alias: 00/02-06-61-15 W5M
Location Alias 2: 00/02-06-061-15 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 15
Section: 06
County/Municipality: Woodlands County
Well Name: TIDEWATER WIND 2-6-61-15
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0042046
License Date: 1972-02-04
License Status: Suspension
Spud Date: 1972-02-16
Final Drill Date: 1972-03-24
Well Total Depth: 2571.00 m
Surface Hole Latitude: 54.241488
Surface Hole Longitude: -116.233613

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-02-04 Obtained License
1972-03-24 Finished Drilling
1972-03-24 Well Mode changed to Drilled and Cased
1972-03-26 Production Casing Operation Performed
1972-04-06 Perforation Treatment Performed - Jet Perforation
1972-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-04-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1972-04-11 Perforation Treatment Performed - Jet Perforation
1972-04-11 Well Log Performed
1972-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-05-11 Perforation Treatment Performed - Nitrogen Treatment
1972-07-10 Well Began Production
1972-07-10 Well Fluid changed to Gas
1972-07-10 Well Mode changed to Flowing
1985-08-29 Well Log Performed
1991-03-08 Perforation Treatment Performed - Jet Perforation
1991-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-14 Well Log Performed
1996-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-28 Plug Back Performed
1996-05-28 Well Log Performed
1996-05-29 Perforation Treatment Performed - Jet Perforation
1996-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-07-01 Well Fluid changed to Gas
2004-07-01 Well Mode changed to Pumping
2018-01-31 Well Fluid changed to Gas
2018-01-31 Well Mode changed to Suspended
2020-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-02-09 Plug Back Performed
2020-02-09 Well Fluid changed to Gas
2020-02-09 Well Log Performed
2020-02-09 Well Mode changed to Abandoned Zone
2020-02-10 Well Log Performed
2020-02-11 Well Log Performed
2020-02-12 Perforation Treatment Performed - Jet Perforation
2020-02-12 Perforation Treatment Performed - Remedial Casing
2020-02-12 Well Log Performed
2020-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-02-13 Perforation Treatment Performed - Jet Perforation
2020-02-13 Perforation Treatment Performed - Remedial Casing
2020-02-13 Well Log Performed
2020-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-02-14 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-04-06 Perforation 2525.90 2528.00 7
1991-03-08 Perforation 2476.00 2477.00 13
1991-03-08 Perforation 2478.00 2479.00 13
1991-03-08 Perforation 2482.00 2483.00 13
1991-03-08 Perforation 2485.00 2487.00 13
1991-03-09 Acid Treatment 2466.00 2487.00 0
1996-05-28 Packing Device Capped w/Cement 2475.80 2480.00 0
1996-05-29 Perforation 2466.00 2473.00 7
1996-05-30 Acid Treatment 2466.00 2473.00 0
2020-02-09 Packing Device Capped w/Cement 2412.00 2420.00 0
2020-02-12 Perforation 775.00 777.00 17
1972-04-08 Acid Treatment 2525.90 2528.00 0
2020-02-12 Remedial Casing Cementing 775.00 777.00 0
2020-02-13 Packing Device Capped w/Cement 740.00 770.00 0
2020-02-13 Perforation 540.00 542.00 17
2020-02-13 Remedial Casing Cementing 540.00 542.00 0
2020-02-13 Packing Device Capped w/Cement 506.20 536.20 0
2020-02-13 Perforation 339.50 341.50 17
2020-02-14 Remedial Casing Cementing 339.50 341.50 0
2020-02-14 Packing Device Capped w/Cement 287.80 337.80 0
1972-04-11 Packing Device Capped w/Cement 2521.60 2523.40 0
1972-04-11 Perforation 2518.00 2520.40 7
1972-04-12 Acid Treatment 2518.00 2520.40 0
1972-05-11 Acid Treatment 2518.00 2520.40 0
1972-05-11 Nitrogen Treatment 2518.00 2520.40 0
1991-03-08 Perforation 2466.00 2472.00 13
1991-03-08 Perforation 2471.00 2473.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 4045 0.0 0.0 0.0
1973 7459 0.0 0.0 0.0
1974 8156 0.0 0.0 0.0
1975 4090 0.0 0.0 0.0
1976 2792 0.0 0.0 0.0
1977 2081 0.0 0.0 0.0
1978 3253 0.0 0.0 0.0
1979 6552 0.0 0.0 0.0
1980 506 0.0 0.0 0.0
1982 5709 0.0 0.0 0.0
1983 8186 0.0 0.0 0.0
1984 7870 0.0 0.0 0.0
1985 8444 0.0 0.0 0.0
1986 7752 0.0 0.0 0.0
1987 8525 0.0 0.0 0.0
1988 8585 0.0 0.0 0.0
1989 8166 0.0 0.0 0.0
1990 8424 0.0 0.0 0.0
1991 7315 0.0 0.0 0.0
1992 7795 0.0 0.0 0.0
1993 8435 0.0 0.0 0.0
1994 8556 0.0 0.0 0.0
1995 7695 0.0 0.0 0.0
1996 6420 0.0 0.0 0.0
1997 7843 0.0 0.0 0.0
1998 6996 0.0 0.0 0.0
1999 7152 0.0 0.0 0.0
2000 8104 0.0 0.0 0.0
2001 7681 0.0 0.0 0.0
2002 8628 0.0 0.0 0.0
2003 8601 0.0 0.0 0.0
2004 8266 0.0 0.0 0.0
2005 8657 0.0 0.0 0.0
2006 8644 0.0 0.0 0.0
2007 8580 0.0 0.0 0.0
2008 7993 0.0 0.0 0.0
2009 8684 0.0 0.0 0.0
2010 6587 0.0 0.0 0.0
2011 7071 0.0 0.0 0.0
2012 6432 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-14 No Incident Encountered 0.00 0.00

For data sources see[6]

References