If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0615182312000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/12-23-061-18W5/0 | |
Location Alias: 00/12-23-61-18 W5M | |
Location Alias 2: 00/12-23-061-18 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 5 | |
Range: 18 | |
Section: 23 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TRILOGY FOXCK 12-23-61-18 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0164786 | |
License Date: 1994-02-07 | |
License Status: Issued | |
Spud Date: 1994-02-17 | |
Final Drill Date: 1994-02-28 | |
Well Total Depth: 1982.00 m | |
Surface Hole Latitude: 54.293663 | |
Surface Hole Longitude: -116.596051 |
Date | Event |
---|---|
1994-02-07 | Obtained License |
1994-02-17 | Lost Circulation Occurred |
1994-02-19 | Surface Casing Operation Performed |
1994-02-28 | Finished Drilling |
1994-02-28 | Well Mode changed to Drilled and Cased |
1994-03-01 | Well Log Performed |
1994-03-02 | Production Casing Operation Performed |
1994-03-03 | Rig Released |
1994-03-10 | Perforation Treatment Performed - Jet Perforation |
1994-03-10 | Well Log Performed |
1994-03-17 | Perforation Treatment Performed - Fractured |
1994-05-02 | Well Began Production |
1994-05-02 | Well Fluid changed to Gas |
1994-05-02 | Well Mode changed to Flowing |
2000-01-20 | Perforation Treatment Performed - Jet Perforation |
2000-01-20 | Well Fluid changed to Gas |
2000-01-20 | Well Log Performed |
2000-01-20 | Well Mode changed to Suspended |
2000-01-21 | Perforation Treatment Performed - Fractured |
2000-11-28 | Perforation Treatment Performed - Jet Perforation |
2000-11-28 | Well Log Performed |
2000-11-30 | Perforation Treatment Performed - Fractured |
2000-12-08 | Well Fluid changed to Gas |
2000-12-08 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-03-10 | Perforation | 1922.00 | 1927.00 | 13 |
1994-03-17 | Fracture | 1922.00 | 1927.00 | 0 |
2000-01-20 | Perforation | 1906.50 | 1910.50 | 17 |
2000-01-21 | Fracture | 1906.50 | 1910.50 | 0 |
2000-11-28 | Perforation | 1671.00 | 1674.00 | 17 |
2000-11-30 | Fracture | 1671.00 | 1674.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 3365 | 0.0 | 0.0 | 0.0 |
1995 | 1345 | 0.0 | 0.0 | 0.0 |
1996 | 7499 | 0.0 | 0.0 | 0.0 |
1997 | 8584 | 0.0 | 0.0 | 0.0 |
1998 | 3411 | 0.0 | 0.0 | 0.0 |
1999 | 6049 | 0.0 | 0.0 | 0.0 |
2000 | 186 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1994-02-17 | Lost Circulation | 61.00 | 61.00 |
For data sources see[6]