X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615200713000

Well Details

Well ID: 0615200713000
Loading map...
Location: 00/13-07-061-20W5/0
Location Alias: 00/13-07-61-20 W5M
Location Alias 2: 00/13-07-061-20 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 20
Section: 07
County/Municipality: Municipal District of Greenview No. 16
Well Name: XTO KAYBOBS 13-7-61-20
Operator Name: XTO Energy Canada ULC
License Number: 0464663
License Date: 2014-02-04
License Status: Amended
Spud Date: 2015-01-10
Final Drill Date: 2015-02-21
Well Total Depth: 5710.00 m
Surface Hole Latitude: 54.247380
Surface Hole Longitude: -117.004305

For data sources see[1][2]

Well History

Date Event
2014-02-04 Obtained License
2015-01-13 Surface Casing Operation Performed
2015-01-15 Direction Drilling Operation Performed - Deviate
2015-01-18 Direction Drilling Operation Performed - Deviate
2015-01-31 Intermediate Casing Operation Performed
2015-02-03 Direction Drilling Operation Performed - Horizontal
2015-02-20 Well Log Performed
2015-02-21 Finished Drilling
2015-02-21 Well Mode changed to Drilled and Cased
2015-02-27 Production Casing Operation Performed
2015-02-27 Rig Released
2015-03-10 Perforation Treatment Performed - Fractured
2015-03-10 Perforation Treatment Performed - Jet Perforation
2015-03-12 Perforation Treatment Performed - Fractured
2015-03-12 Perforation Treatment Performed - Jet Perforation
2015-03-13 Well Log Performed
2015-03-14 Perforation Treatment Performed - Fractured
2015-03-14 Perforation Treatment Performed - Jet Perforation
2015-03-15 Perforation Treatment Performed - Fractured
2015-03-15 Perforation Treatment Performed - Jet Perforation
2015-03-16 Perforation Treatment Performed - Fractured
2015-03-16 Perforation Treatment Performed - Jet Perforation
2015-03-17 Perforation Treatment Performed - Fractured
2015-03-17 Perforation Treatment Performed - Jet Perforation
2015-03-18 Perforation Treatment Performed - Fractured
2015-03-18 Perforation Treatment Performed - Jet Perforation
2015-03-19 Perforation Treatment Performed - Fractured
2015-03-19 Perforation Treatment Performed - Jet Perforation
2015-03-20 Perforation Treatment Performed - Fractured
2015-03-20 Perforation Treatment Performed - Jet Perforation
2015-07-01 Well Began Production
2015-07-01 Well Fluid changed to Shale Gas Only
2015-07-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-01-10 Nabors Drilling Limited 85 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-01-15 944.20 Deviate (5 - 79 degrees)
2015-01-18 2290.00 Deviate (5 - 79 degrees)
2015-02-03 3599.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-03-10 Perforation 5624.00 5624.50 20
2015-03-12 Perforation 5485.50 5486.00 20
2015-03-19 Perforation 3941.50 3942.00 20
2015-03-19 Perforation 3897.00 3897.50 20
2015-03-19 Perforation 3895.80 3896.30 20
2015-03-19 Fracture 3895.80 3943.20 0
2015-03-19 Perforation 3851.30 3851.80 20
2015-03-19 Perforation 3850.10 3850.60 20
2015-03-19 Perforation 3805.60 3806.10 20
2015-03-19 Perforation 3804.40 3804.90 20
2015-03-20 Fracture 3804.40 3851.80 0
2015-03-20 Perforation 3759.90 3760.40 20
2015-03-12 Fracture 5485.50 5564.00 0
2015-03-20 Perforation 3758.70 3759.20 20
2015-03-20 Perforation 3714.20 3714.70 20
2015-03-20 Perforation 3713.00 3713.50 20
2015-03-20 Fracture 3713.00 3760.40 0
2015-03-20 Perforation 3668.50 3669.00 20
2015-03-20 Perforation 3667.30 3667.80 20
2015-03-20 Perforation 3622.80 3623.30 20
2015-03-20 Perforation 3621.60 3622.10 20
2015-03-20 Fracture 3621.60 3669.00 0
2015-03-12 Perforation 5465.00 5465.50 20
2015-03-12 Perforation 5445.50 5446.00 20
2015-03-12 Perforation 5426.00 5426.50 20
2015-03-12 Perforation 5406.50 5407.00 20
2015-03-12 Perforation 5387.00 5387.50 20
2015-03-12 Fracture 5387.00 5465.50 0
2015-03-14 Perforation 5366.50 5367.00 20
2015-03-14 Perforation 5347.00 5347.50 20
2015-03-10 Perforation 5609.00 5609.50 20
2015-03-14 Perforation 5327.50 5328.00 20
2015-03-14 Perforation 5308.00 5308.50 20
2015-03-14 Perforation 5288.50 5289.00 20
2015-03-14 Fracture 5288.50 5367.00 0
2015-03-14 Perforation 5268.00 5268.50 20
2015-03-14 Perforation 5242.00 5242.50 20
2015-03-14 Perforation 5216.00 5216.50 20
2015-03-14 Perforation 5190.00 5190.50 20
2015-03-14 Fracture 5190.00 5268.50 0
2015-03-15 Perforation 5169.50 5170.00 20
2015-03-10 Perforation 5594.00 5594.50 20
2015-03-15 Perforation 5143.50 5144.00 20
2015-03-15 Perforation 5117.50 5118.00 20
2015-03-15 Perforation 5091.50 5092.00 20
2015-03-15 Fracture 5091.50 5170.00 0
2015-03-15 Perforation 5071.00 5071.50 20
2015-03-15 Perforation 5045.00 5045.50 20
2015-03-15 Perforation 5019.00 5019.50 20
2015-03-15 Perforation 4993.00 4993.50 20
2015-03-15 Fracture 4993.00 5071.50 0
2015-03-15 Perforation 4973.00 4973.50 20
2015-03-10 Perforation 5579.00 5579.50 20
2015-03-15 Perforation 4947.00 4947.50 20
2015-03-15 Perforation 4921.00 4921.50 20
2015-03-15 Perforation 4895.00 4895.50 20
2015-03-16 Fracture 4895.00 4973.50 0
2015-03-16 Perforation 4861.50 4862.00 20
2015-03-16 Perforation 4860.30 4860.80 20
2015-03-16 Perforation 4827.30 4827.80 20
2015-03-16 Perforation 4826.10 4826.60 20
2015-03-16 Fracture 4826.10 4862.00 0
2015-03-16 Perforation 4793.00 4793.50 20
2015-03-10 Fracture 5579.00 5624.50 0
2015-03-16 Perforation 4791.80 4792.30 20
2015-03-16 Perforation 4758.80 4759.30 20
2015-03-16 Perforation 4757.60 4758.10 20
2015-03-16 Fracture 4757.60 4793.50 0
2015-03-16 Perforation 4717.60 4718.10 20
2015-03-16 Perforation 4716.40 4716.90 20
2015-03-16 Perforation 4680.40 4680.90 20
2015-03-16 Perforation 4679.20 4679.70 20
2015-03-17 Fracture 4679.20 4718.10 0
2015-03-17 Perforation 4646.10 4646.60 20
2015-03-12 Perforation 5563.50 5564.00 20
2015-03-17 Perforation 4644.90 4645.40 20
2015-03-17 Perforation 4609.80 4610.30 20
2015-03-17 Perforation 4608.60 4609.10 20
2015-03-17 Fracture 4608.60 4646.60 0
2015-03-17 Perforation 4572.60 4573.10 20
2015-03-17 Perforation 4571.40 4571.90 20
2015-03-17 Perforation 4536.80 4537.30 20
2015-03-17 Perforation 4535.60 4536.10 20
2015-03-17 Fracture 4535.60 4573.10 0
2015-03-17 Perforation 4489.90 4490.40 20
2015-03-12 Perforation 5544.00 5544.50 20
2015-03-17 Perforation 4488.70 4489.20 20
2015-03-17 Perforation 4445.40 4445.90 20
2015-03-17 Perforation 4444.20 4444.70 20
2015-03-17 Fracture 4444.20 4490.40 0
2015-03-18 Perforation 4399.70 4400.20 20
2015-03-18 Perforation 4398.50 4399.00 20
2015-03-18 Perforation 4354.00 4354.50 20
2015-03-18 Perforation 4352.80 4353.30 20
2015-03-18 Fracture 4352.80 4400.20 0
2015-03-18 Perforation 4308.30 4308.80 20
2015-03-12 Perforation 5524.50 5525.00 20
2015-03-18 Perforation 4307.10 4307.60 20
2015-03-18 Perforation 4262.60 4263.10 20
2015-03-18 Perforation 4261.40 4261.90 20
2015-03-18 Fracture 4261.40 4308.80 0
2015-03-18 Perforation 4216.90 4217.40 20
2015-03-18 Perforation 4215.70 4216.20 20
2015-03-18 Perforation 4171.20 4171.70 20
2015-03-18 Perforation 4170.00 4170.50 20
2015-03-19 Fracture 4170.00 4217.40 0
2015-03-19 Perforation 4125.50 4126.00 20
2015-03-12 Perforation 5505.00 5505.50 20
2015-03-19 Perforation 4124.30 4124.80 20
2015-03-19 Perforation 4079.80 4080.30 20
2015-03-19 Perforation 4078.60 4079.10 20
2015-03-19 Fracture 4078.60 4126.00 0
2015-03-19 Perforation 4034.10 4034.60 20
2015-03-19 Perforation 4032.90 4033.40 20
2015-03-19 Perforation 3988.40 3988.90 20
2015-03-19 Perforation 3987.20 3987.70 20
2015-03-19 Fracture 3987.20 4034.60 0
2015-03-19 Perforation 3942.70 3943.20 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-03-10 2015-03-20 3,396 51,021 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 92.3925 N/A
Atlas CRC-C (30/50) Canyon Crystalline silica. quartz 14808-60-7 100 0.6088 N/A
Hexamethylenetetramine 100-97-0 100 0.6088 N/A
Phenol formaldehyde resin 9003-35-4 100 0.6088 N/A
Sand (40/70) Ottawa Canyon Aluminum Oxide 1344-28-1 100 5.9697 N/A
Crystalline silica. quartz 14808-60-7 100 5.9697 N/A
Iron Oxide 1309-37-1 100 5.9697 N/A
Titanium Oxide 13463-67-7 100 5.9697 N/A
Sand (50/140) Canyon Aluminum Oxide 1344-28-1 100 0.2549 N/A
Crystalline silica. quartz 14808-60-7 100 0.2549 N/A
Iron Oxide 1309-37-1 100 0.2549 N/A
Titanium Oxide 13463-67-7 100 0.2549 N/A
HCL 15% Canyon Acid Hydrogen Chloride 7647-01-0 100 0.5648 N/A
Water 7732-18-5 100 0.5648 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0128 N/A
Water 7732-18-5 100 0.0128 N/A
CAN-1000 Corrosion Inhibitor Canyon Corrosion Inhibitor Refer to MSDS 8141 100 0.0052 N/A
CAN-1203 Anti-Sludge Agent / Non-Emulsifier Canyon Demulsifier Refer to MSDS 8253 100 0.0028 N/A
CAN-2057 Friction Reducer Canyon Gelling Agent No hazardous ingredients Not Available 100 0.1176 N/A
CAN-1101 Iron Control Reduction Canyon Iron Control 2-Mercaptoethanol 60-24-2 100 0.0047 N/A
Cupric Chloride 7447-39-4 100 0.0047 N/A
Monoethanolamine 141-43-5 100 0.0047 N/A
CAN-1202 Acid Wetting Agent Canyon Surfactant 1-Methoxy-2-Propanol 107-98-2 100 0.0022 N/A
Water 7732-18-5 100 0.0022 N/A
CAN-2403 nanoFLO Canyon Surfactant Ethanol 64-17-5 100 0.09 N/A
Methanol 67-56-1 100 0.09 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.09 N/A
Water 7732-18-5 100 0.09 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-03-06 2015-03-14 Surface Water - River 29266
2015-02-19 2015-03-05 Surface Water - River 20705
2015-03-15 2015-03-16 Oilfield Produced Water 1050

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1440 0.0 0.0 0.0
2016 8246 0.0 0.0 0.0
2017 7901 0.0 0.0 0.0
2018 7345 0.0 0.0 0.0
2019 5587 0.0 0.0 0.0
2020 1944 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-27 No Incident Encountered 0.00 0.00
2015-06-30 No Incident Encountered 0.00 0.00

For data sources see[10]

References