X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615202210003

Well Details

Well ID: 0615202210003
Loading map...
Location: 00/10-22-061-20W5/3
Location Alias: 00/10-22-61-20 W5M
Location Alias 2: 00/10-22-061-20 W5/03
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 20
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: DAYLIGHT KAYBOBS 10-22-61-20
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0042634
License Date: 1972-06-01
License Status: Suspension
Spud Date: 1972-06-29
Final Drill Date: 1972-07-18
Well Total Depth: 2274.10 m
Surface Hole Latitude: 54.293644
Surface Hole Longitude: -116.908280

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-06-01 Obtained License
1972-07-13 Drill Stem Test Performed
1972-07-18 Finished Drilling
1972-07-18 Well Mode changed to Drilled and Cased
1972-07-21 Drill Stem Test Performed
1972-07-22 Drill Stem Test Performed
1972-07-23 Production Casing Operation Performed
1972-12-04 Perforation Treatment Performed - Jet Perforation
1996-09-21 Perforation Treatment Performed - Jet Perforation
1996-09-22 Perforation Treatment Performed - Fractured
1996-11-26 Perforation Treatment Performed - Jet Perforation
1997-02-05 Perforation Treatment Performed - Fractured
1997-06-15 Perforation Treatment Performed - Fractured
1997-08-04 Perforation Treatment Performed - Fractured
1999-07-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-07-08 Plug Back Performed
1999-07-08 Well Log Performed
1999-08-12 Well Log Performed
1999-08-13 Perforation Treatment Performed - Jet Perforation
1999-08-17 Perforation Treatment Performed - Fractured
1999-09-25 Well Began Production
1999-09-25 Well Fluid changed to Gas
1999-09-25 Well Mode changed to Flowing
2011-12-01 Well Fluid changed to Gas
2011-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-12-04 Perforation 2092.80 2095.80 7
1999-07-08 Packing Device Capped w/Cement 2077.00 2085.00 0
1999-07-08 Packing Device Capped w/Cement 2046.00 2054.00 0
1999-08-13 Perforation 1806.90 1810.50 17
1999-08-17 Fracture 1806.90 1810.50 0
1972-12-04 Perforation 2097.00 2100.10 7
1996-09-21 Perforation 2063.50 2066.00 13
1996-09-22 Fracture 2063.50 2066.00 0
1996-11-26 Perforation 2092.70 2095.70 13
1996-11-26 Perforation 2097.00 2103.00 13
1997-02-05 Fracture 2092.70 2103.00 0
1997-06-15 Fracture 2092.70 2103.00 0
1997-08-04 Fracture 2092.70 2103.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 1897 0.0 0.0 0.0
2000 6351 0.0 0.0 0.0
2001 5375 0.0 0.0 0.0
2002 1052 0.0 0.0 0.0
2003 3848 0.0 0.0 0.0
2004 7215 0.0 0.0 0.0
2005 6314 0.0 0.0 0.0
2006 8705 0.0 0.0 0.0
2007 5669 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 5263 0.0 0.0 0.0
2010 2975 0.0 0.0 0.0

For data sources see[5]

References