X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615220911023

Well Details

Well ID: 0615220911023
Loading map...
Location: 02/11-09-061-22W5/3
Location Alias: 02/11-09-61-22 W5M
Location Alias 2: 02/11-09-061-22 W5/03
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 22
Section: 09
County/Municipality: Municipal District of Greenview No. 16
Well Name: TALISMAN BIGSTONE 11-9-61-22
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0229543
License Date: 1999-12-02
License Status: Issued
Spud Date: 1999-12-29
Final Drill Date: 2000-01-22
Well Total Depth: 3300.00 m
Surface Hole Latitude: 54.262545
Surface Hole Longitude: -117.243934

For data sources see[1][2]

Well History

Date Event
1999-12-02 Obtained License
1999-12-30 Surface Casing Operation Performed
2000-01-22 Finished Drilling
2000-01-22 Well Log Performed
2000-01-22 Well Mode changed to Drilled and Cased
2000-01-23 Well Log Performed
2000-01-25 Intermediate Casing Operation Performed
2000-01-25 Liner Casing Operation Performed
2000-01-26 Rig Released
2000-03-03 Well Log Performed
2000-03-04 Well Log Performed
2000-03-05 Perforation Treatment Performed - Jet Perforation
2000-03-08 Perforation Treatment Performed - Acid Wash - No Pressure
2000-03-12 Well Log Performed
2000-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-03-13 Plug Back Performed
2000-06-24 Perforation Treatment Performed - Jet Perforation
2000-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-27 Perforation Treatment Performed - Jet Perforation
2000-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-30 Plug Back Performed
2000-07-01 Perforation Treatment Performed - Jet Perforation
2000-07-01 Well Mode changed to Drilled and Cased
2000-07-05 Perforation Treatment Performed - Fractured
2000-11-03 Well Began Production
2000-11-03 Well Fluid changed to Gas
2000-11-03 Well Mode changed to Flowing
2011-06-01 Well Fluid changed to Gas
2011-06-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-03-05 Perforation 3247.50 3260.00 17
2000-07-01 Perforation 2405.00 2407.50 20
2000-07-01 Perforation 2409.00 2414.00 20
2000-07-05 Fracture 2405.00 2407.50 0
2000-07-05 Fracture 2409.00 2414.00 0
2000-03-08 Acid Wash 3247.50 3260.00 0
2000-03-13 Packing Device Capped w/Cement 3247.50 3260.00 0
2000-06-24 Perforation 2582.00 2584.50 20
2000-06-25 Acid Treatment 2582.00 2584.50 0
2000-06-27 Packing Device Capped w/Cement 2570.00 2578.00 0
2000-06-27 Perforation 2544.50 2547.50 20
2000-06-30 Acid Treatment 2544.50 2547.50 0
2000-06-30 Packing Device Capped w/Cement 2530.00 2538.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 1347 0.0 0.0 0.0
2001 8676 0.0 0.0 0.0
2002 8754 0.0 0.0 0.0
2003 8757 0.0 0.0 0.0
2004 8663 0.0 0.0 0.0
2005 8711 0.0 0.0 0.0
2006 8639 0.0 0.0 0.0
2007 8697 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8664 0.0 0.0 0.0
2010 8663 0.0 0.0 0.0
2011 8735 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8687 0.0 0.0 0.0
2014 8163 0.0 0.0 0.0
2015 8156 0.0 0.0 0.0
2016 7939 0.0 0.0 0.0
2017 7177 0.0 0.0 0.0
2018 7924 0.0 0.0 0.0
2019 7846 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[5]

References